Picture this.

2
00:00:00,990 --> 00:00:03,200
You're forty minutes into a render clean.

3
00:00:03,260 --> 00:00:06,640
The wind has picked up, a neighbour is
asking about her car,

4
00:00:06,680 --> 00:00:10,080
and you suddenly can't remember whether
you photographed that hairline crack by the

5
00:00:10,112 --> 00:00:10,880
back door.

6
00:00:10,980 --> 00:00:11,840
Did you?

7
00:00:11,920 --> 00:00:13,120
You honestly don't know.

8
00:00:13,280 --> 00:00:17,760
That moment, right there, is what happens
when a job lives in your head instead of

9
00:00:17,813 --> 00:00:18,640
on paper.

10
00:00:18,667 --> 00:00:20,827
I'm Mark Cave, founder of SoftWash UK.

11
00:00:21,094 --> 00:00:26,507
In the last episode, I went through 240
things professional softwashing asks you to

12
00:00:26,547 --> 00:00:27,147
get right.

13
00:00:27,360 --> 00:00:31,627
Roofs, render, chemistry, safety, pricing.

14
00:00:31,847 --> 00:00:37,147
And the obvious question afterwards is
this: how on earth do you remember all of

15
00:00:37,211 --> 00:00:39,307
that on a driveway in the rain?

16
00:00:39,547 --> 00:00:42,187
The honest answer is, you don't.

17
00:00:42,327 --> 00:00:44,387
You build it into a system.

18
00:00:44,560 --> 00:00:48,907
So today is a bit of a coaching session on
Standard Operating Procedures,

19
00:00:48,947 --> 00:00:51,147
and a five stage Professional Job Pack.

20
00:00:51,167 --> 00:00:52,767
Let's start with the problem.

21
00:00:52,836 --> 00:00:56,767
Plenty of new contractors treat
softwashing as spray and walk away.

22
00:00:56,879 --> 00:00:59,647
They rely on memory, or trial and error.

23
00:00:59,759 --> 00:01:03,167
That might get you through a calm day on a
forgiving surface.

24
00:01:03,300 --> 00:01:08,207
It falls apart with UK weather, delicate
substrates and potent chemicals,

25
00:01:08,247 --> 00:01:09,967
all on the same week's diary.

26
00:01:10,000 --> 00:01:13,200
An SOP is not bureaucratic red tape.

27
00:01:13,280 --> 00:01:17,440
It's a step by step checklist, written
down, so the same safety,

28
00:01:17,500 --> 00:01:21,360
quality and environmental precautions
happen on every single job,

29
00:01:21,422 --> 00:01:23,280
domestic or commercial.

30
00:01:23,330 --> 00:01:27,120
Whether you're tired, rushed, or it's your
third job of the day.

31
00:01:27,160 --> 00:01:28,560
The checklist doesn't forget.

32
00:01:28,720 --> 00:01:29,680
You might.

33
00:01:29,708 --> 00:01:31,708
Stage one is the pre clean survey.

34
00:01:31,788 --> 00:01:35,548
And a proper survey goes far beyond
measuring square metres for a quote.

35
00:01:35,695 --> 00:01:37,388
First, the substrate.

36
00:01:37,495 --> 00:01:39,228
Is the render blown or hollow?

37
00:01:39,388 --> 00:01:43,708
Monocouche and thin coat systems can
debond, and a tap with your knuckle will tell

38
00:01:43,728 --> 00:01:44,268
you a lot.

39
00:01:44,396 --> 00:01:49,388
What about crumbling lime mortar, spalling
brick, or tile surfaces that are flaking?

40
00:01:49,528 --> 00:01:51,708
And paint that's chalking or peeling.

41
00:01:51,868 --> 00:01:54,348
Here's what many contractors overlook.

42
00:01:54,444 --> 00:01:57,788
Dirt can be hiding a failed coating, and
once you clean it,

43
00:01:57,808 --> 00:02:01,068
the failure is on show, and the customer
thinks you caused it.

44
00:02:01,083 --> 00:02:04,283
Next, diagnose the stain before you choose
a chemical.

45
00:02:04,523 --> 00:02:07,803
Is it organic, like algae, lichen or
mould?

46
00:02:07,830 --> 00:02:12,123
Or is it inorganic, like rust,
efflorescence, carbon from pollution,

47
00:02:12,176 --> 00:02:13,883
or lead oxidation?

48
00:02:13,983 --> 00:02:18,443
Bleach will not fix a rust stain, and
stronger bleach certainly won't.

49
00:02:18,603 --> 00:02:21,643
Get this wrong and everything after it is
wrong too.

50
00:02:21,667 --> 00:02:22,707
Then map the water.

51
00:02:22,760 --> 00:02:23,667
Where does it go?

52
00:02:23,779 --> 00:02:27,827
Find the surface water drains, because
those can discharge into local streams and

53
00:02:27,884 --> 00:02:28,307
rivers.

54
00:02:28,467 --> 00:02:30,907
Find the foul sewer access.

55
00:02:30,963 --> 00:02:34,627
Spot the ponds, the soakaways, the
neighbour's garden on the other side of the

56
00:02:34,694 --> 00:02:35,347
fence.

57
00:02:35,480 --> 00:02:39,747
If you can't control the runoff, you don't
have a plan, you have a hope.

58
00:02:39,750 --> 00:02:42,070
And finally, a photographic baseline.

59
00:02:42,203 --> 00:02:46,150
Cracked tiles, hairline fissures in
render, scratched glazing,

60
00:02:46,203 --> 00:02:47,270
tired window frames.

61
00:02:47,365 --> 00:02:51,350
Photograph it all before you unpack the
equipment or turn a valve.

62
00:02:51,462 --> 00:02:53,830
Then walk the customer through those
photos.

63
00:02:54,017 --> 00:02:57,350
It protects you, and honestly, it protects
them as well.

64
00:02:57,375 --> 00:03:01,455
Stage two is the site specific job pack,
and the RAMS inside it.

65
00:03:01,599 --> 00:03:03,855
Risk Assessment and Method Statement.

66
00:03:04,295 --> 00:03:09,615
A generic tick box RAMS gives you almost
no protection in a dispute or an HSE

67
00:03:09,666 --> 00:03:10,335
inspection.

68
00:03:10,575 --> 00:03:13,015
It has to describe this job.

69
00:03:13,105 --> 00:03:16,495
How you're delivering the chemical,
whether that's a water fed pole,

70
00:03:16,555 --> 00:03:19,055
low pressure application, or a MEWP for
access.

71
00:03:19,215 --> 00:03:22,735
Where the exclusion zones are for the
public and for pets.

72
00:03:22,935 --> 00:03:25,695
How you'll hydrate and pre wet the plants.

73
00:03:25,855 --> 00:03:30,255
How you'll shield sensitive metals, like
lead flashings, copper and anodised

74
00:03:30,303 --> 00:03:31,095
aluminium.

75
00:03:31,185 --> 00:03:33,615
And where your emergency wash down point
is.

76
00:03:33,855 --> 00:03:38,735
The risk assessment identifies the
hazards, and the method statement explains how

77
00:03:38,755 --> 00:03:40,495
the work will actually be carried out.

78
00:03:40,639 --> 00:03:41,935
They work together.

79
00:03:41,958 --> 00:03:44,278
Stage three is the chemical application
log.

80
00:03:44,358 --> 00:03:45,638
Record the stock batch.

81
00:03:45,741 --> 00:03:49,238
Record the strength you actually get at
the nozzle, because a proportioner dial is a

82
00:03:49,305 --> 00:03:50,678
claim, not a measurement.

83
00:03:50,790 --> 00:03:52,318
Test the real mix.

84
00:03:52,369 --> 00:03:56,358
Record your surfactant dosing, for example
Clever Wash, which helps with cling and

85
00:03:56,390 --> 00:03:57,798
with reducing runoff.

86
00:03:57,878 --> 00:03:59,798
Record the delivery volume.

87
00:04:00,042 --> 00:04:01,242
Then log the conditions.

88
00:04:01,362 --> 00:04:05,162
Air temperature, surface temperature, wind
direction and speed,

89
00:04:05,215 --> 00:04:08,122
dwell time, and whether the rinse was
completed.

90
00:04:08,255 --> 00:04:12,682
It feels like a lot of writing, until a
customer says you damaged something.

91
00:04:12,802 --> 00:04:14,362
Now you have an audit trail.

92
00:04:14,482 --> 00:04:17,802
And over time, that history makes your
quoting sharper too,

93
00:04:17,832 --> 00:04:21,562
because you stop guessing how long a job
really takes and what it really uses.

94
00:04:21,583 --> 00:04:25,343
Stage four is structured troubleshooting,
and this is where splash and dash

95
00:04:25,399 --> 00:04:26,783
operators get caught out.

96
00:04:27,063 --> 00:04:31,343
A surface doesn't clean as expected, so
they reach for a stronger hypochlorite mix.

97
00:04:31,455 --> 00:04:34,783
That's how you end up with etched surfaces
and scorched plants.

98
00:04:35,103 --> 00:04:39,183
A professional SOP says, stop, and run
five checks.

99
00:04:39,208 --> 00:04:41,048
One, verify the stain.

100
00:04:41,155 --> 00:04:45,048
Is it actually a mineral or oil stain that
hypochlorite can't shift?

101
00:04:45,208 --> 00:04:46,888
Two, check the chemical.

102
00:04:47,028 --> 00:04:50,248
Has the stock degraded from heat or poor
storage?

103
00:04:50,341 --> 00:04:52,088
Three, look at contact.

104
00:04:52,188 --> 00:04:55,288
Did it dry too early, and was the
surfactant doing its job?

105
00:04:55,480 --> 00:04:58,128
Four, inspect the equipment.

106
00:04:58,200 --> 00:05:01,288
Flow rate, hose back pressure, and
dilution ratio.

107
00:05:01,448 --> 00:05:04,088
Five, review the history of the surface.

108
00:05:04,221 --> 00:05:07,848
Is there a sealer nobody mentioned, or a
failed treatment from a previous

109
00:05:07,899 --> 00:05:08,648
contractor?

110
00:05:08,776 --> 00:05:13,848
Nine times out of ten, the answer is in
those five checks, not in a stronger bottle.

111
00:05:13,875 --> 00:05:17,475
Stage five is the handover and customer
aftercare sheet.

112
00:05:17,675 --> 00:05:19,955
Put expectations in writing.

113
00:05:20,275 --> 00:05:25,235
If you've applied a DDAC treatment on a
roof or tarmac, explain that dead moss and

114
00:05:25,275 --> 00:05:28,115
lichen weather away over months, not
minutes.

115
00:05:28,243 --> 00:05:31,635
Give written advice on plant care and
window rinsing.

116
00:05:31,715 --> 00:05:35,475
And offer an annual preventative
maintenance programme, so the customer knows what

117
00:05:35,515 --> 00:05:36,275
comes next.

118
00:05:36,292 --> 00:05:37,172
Now, I'll be straight with you.

119
00:05:37,272 --> 00:05:41,972
Podcasts like this are a great starting
point, but writing an SOP that actually

120
00:05:42,039 --> 00:05:47,812
holds up takes real understanding of
surfaces, chemistry, safety and compliance.

121
00:05:47,874 --> 00:05:53,252
Building these systems is a core pillar of
the SoftWash UK CPD Certified Softwash

122
00:05:53,288 --> 00:05:54,372
Training Course.

123
00:05:54,479 --> 00:05:59,012
It's online, so you learn at your own
pace, and it's built from years of real world

124
00:05:59,065 --> 00:06:03,252
industry experience to help you avoid
mistakes and work more professionally.

125
00:06:03,292 --> 00:06:06,412
Completing the training also gives you
access to compliance packs,

126
00:06:06,460 --> 00:06:10,092
including RAMS, COSHH and application
sheets.

127
00:06:10,305 --> 00:06:14,012
It makes you eligible to become an
Approved Softwash Applicator,

128
00:06:14,092 --> 00:06:18,012
with a directory listing, and it brings
you into the National Association of

129
00:06:18,092 --> 00:06:19,372
Softwash community.

130
00:06:19,472 --> 00:06:22,412
You'll find it all at softwashing.uk.

131
00:06:22,583 --> 00:06:23,783
So here's your action step.

132
00:06:23,874 --> 00:06:28,343
Before your next job, write down your five
stages on one page.

133
00:06:28,469 --> 00:06:34,023
Survey, job pack, application log,
diagnostic checks, handover.

134
00:06:34,119 --> 00:06:35,143
Just the headings.

135
00:06:35,287 --> 00:06:38,263
Then fill in the detail one job at a time.

136
00:06:38,375 --> 00:06:40,503
That's how a system gets built.

137
00:06:40,560 --> 00:06:42,983
Thanks for listening, and take care until
next time.