1
00:00:00,100 --> 00:00:03,320
There are two camps online, and they
cannot stand each other.

2
00:00:04,200 --> 00:00:08,960
On one side you've got the pressure
washing cowboys, putting a 3,000 PSI lance on

3
00:00:09,020 --> 00:00:11,080
timber decking and chewing the boards up.

4
00:00:11,940 --> 00:00:15,900
On the other side, the purists, who say
bleach should never touch wood.

5
00:00:16,420 --> 00:00:16,700
Never.

6
00:00:17,680 --> 00:00:20,800
And I think, um, both camps are arguing
about the wrong thing.

7
00:00:21,353 --> 00:00:25,373
Because the question isn't really "can you
use sodium hypochlorite on wood?"

8
00:00:25,913 --> 00:00:29,433
It's what state is the wood in when the
chemical lands on it.

9
00:00:30,433 --> 00:00:31,573
Yes, you can use it.

10
00:00:31,933 --> 00:00:34,433
But only if you understand what you're
spraying onto.

11
00:00:35,387 --> 00:00:36,847
So picture a deck board in July.

12
00:00:37,347 --> 00:00:39,367
Bone dry, hasn't rained for weeks.

13
00:00:40,087 --> 00:00:43,927
Wood is basically an organic sponge, and a
dry sponge is, is,

14
00:00:43,967 --> 00:00:44,687
is thirsty.

15
00:00:45,727 --> 00:00:48,307
Spray a bleach mix on it and it doesn't
sit on top.

16
00:00:48,687 --> 00:00:49,987
The board drinks it.

17
00:00:50,547 --> 00:00:52,987
Down through the capillaries, deep into
the timber.

18
00:00:53,817 --> 00:00:55,057
And here's the bit that matters.

19
00:00:55,797 --> 00:00:59,857
Inside the wood you've got cellulose
fibres, and the natural glue holding them

20
00:00:59,877 --> 00:01:01,357
together is called lignin.

21
00:01:02,337 --> 00:01:06,537
Sodium hypochlorite is an oxidiser, so
once it's drawn deep in,

22
00:01:06,877 --> 00:01:08,537
it keeps attacking that lignin.

23
00:01:09,077 --> 00:01:10,377
You can't rinse it out of there.

24
00:01:11,297 --> 00:01:15,317
The fibres lose their glue, and you get
that furred, grey, driftwood look.

25
00:01:15,797 --> 00:01:16,177
Brittle.

26
00:01:16,697 --> 00:01:17,217
Splintering.

27
00:01:17,757 --> 00:01:18,677
Weaker than it was.

28
00:01:19,565 --> 00:01:21,745
Now you might be thinking, well, just
rinse harder.

29
00:01:22,465 --> 00:01:23,125
Um, no.

30
00:01:23,685 --> 00:01:27,385
Rinsing the surface doesn't pull chemical
back out of the middle of a board.

31
00:01:27,865 --> 00:01:31,205
The damage has already been done by the
draw, not by the dwell.

32
00:01:32,035 --> 00:01:32,695
So what's the rule?

33
00:01:33,555 --> 00:01:34,415
Wet it first.

34
00:01:34,975 --> 00:01:35,515
Properly.

35
00:01:36,135 --> 00:01:40,975
I don't mean a quick sprinkle, I mean
drench it with clean water and let it sit so

36
00:01:41,015 --> 00:01:42,195
the fibres plump up.

37
00:01:42,875 --> 00:01:44,795
A full sponge can't drink any more.

38
00:01:45,675 --> 00:01:49,855
Then when you apply your mix, the
chemistry stays on the outer couple of microns,

39
00:01:50,235 --> 00:01:53,715
and that's exactly where the algae and the
fungal hyphae live anyway.

40
00:01:54,495 --> 00:01:56,155
You're not trying to treat the whole
board.

41
00:01:56,555 --> 00:01:57,615
You're treating the skin.

42
00:01:58,360 --> 00:02:01,720
Let me paint you a scenario, and it's one
I'd happily use in training.

43
00:02:02,420 --> 00:02:06,060
A contractor turns up to an expensive
cedar deck on a hot afternoon.

44
00:02:06,640 --> 00:02:08,180
Sun baked, dry as a bone.

45
00:02:08,799 --> 00:02:13,020
He's got a patio mix in the sprayer, about
4%, and he never measured it,

46
00:02:13,380 --> 00:02:14,380
he just glugged it in.

47
00:02:15,020 --> 00:02:15,760
No pre wet.

48
00:02:16,400 --> 00:02:17,120
Sprays the lot.

49
00:02:18,660 --> 00:02:22,100
Within the hour that lovely outdoor living
space is bleached,

50
00:02:22,580 --> 00:02:23,520
splintering driftwood.

51
00:02:23,682 --> 00:02:26,102
And then comes the part nobody budgets
for.

52
00:02:26,662 --> 00:02:30,262
The customer wants the boards replaced,
he's arguing about whose fault it is,

53
00:02:30,842 --> 00:02:36,002
and it's, it's, it's a replacement dispute
that eats the profit from twenty other

54
00:02:36,062 --> 00:02:36,402
jobs.

55
00:02:37,222 --> 00:02:39,462
All from skipping a hose and a measuring
jug.

56
00:02:40,062 --> 00:02:44,602
As I say on the SoftWash UK blog, use the
weakest solution that will do the job

57
00:02:44,642 --> 00:02:45,222
effectively.

58
00:02:45,842 --> 00:02:49,162
A patio strength mix on timber is the
opposite of that.

59
00:02:49,892 --> 00:02:52,052
Right, so what should the recipe actually
be?

60
00:02:52,692 --> 00:02:56,352
Wood is soft, green algae is soft, so you
don't need roof strength.

61
00:02:56,892 --> 00:02:58,732
You want about a 1% working mix.

62
00:02:59,312 --> 00:03:04,232
If your stock is the standard 15% sodium
hypochlorite, that's roughly one part

63
00:03:04,272 --> 00:03:06,272
chemical to fourteen parts water.

64
00:03:06,832 --> 00:03:10,592
Work it out from the strength on the drum,
not the strength you hope is on the drum.

65
00:03:11,227 --> 00:03:12,927
Then add a compatible surfactant.

66
00:03:13,527 --> 00:03:18,687
Clever Wash, the guide rate is 200 to 1,
which is 5ml per litre of your softwash

67
00:03:18,767 --> 00:03:19,127
recipe.

68
00:03:19,727 --> 00:03:24,487
It breaks the surface tension so the weak
mix clings and wets the biofilm without

69
00:03:24,527 --> 00:03:25,567
you needing to go stronger.

70
00:03:26,087 --> 00:03:27,987
Dwell time, ten to fifteen minutes.

71
00:03:28,527 --> 00:03:29,327
Strictly timed.

72
00:03:29,787 --> 00:03:31,147
Not "I'll go and have a brew."

73
00:03:31,987 --> 00:03:33,867
Then rinse it off thoroughly with low
pressure.

74
00:03:34,528 --> 00:03:38,228
Now, even a perfect clean can leave the
timber looking, um,

75
00:03:38,728 --> 00:03:39,048
pale.

76
00:03:39,608 --> 00:03:40,088
Yellowish.

77
00:03:40,628 --> 00:03:42,528
A bit washed out and chemically tired.

78
00:03:43,148 --> 00:03:45,728
And customers notice that, they think
you've ruined it.

79
00:03:46,322 --> 00:03:47,622
That's where brightening comes in.

80
00:03:48,202 --> 00:03:50,982
We use Wood X Pro, which is an oxalic acid
treatment.

81
00:03:51,422 --> 00:03:52,922
Important order of events though.

82
00:03:53,382 --> 00:03:57,322
Hypochlorite off first, rinsed completely,
and only then the acid,

83
00:03:57,682 --> 00:04:00,142
because those two must never meet in the
same bucket.

84
00:04:00,762 --> 00:04:03,702
Once it's rinsed, you apply the mild acid
to the damp wood.

85
00:04:04,242 --> 00:04:08,342
It neutralises the alkaline salt residues,
resets the surface pH,

86
00:04:08,742 --> 00:04:11,542
and the warm honey grain comes back in
front of your eyes.

87
00:04:12,162 --> 00:04:13,822
That's the moment customers remember.

88
00:04:14,425 --> 00:04:16,525
Then the mistake I see right at the finish
line.

89
00:04:17,045 --> 00:04:20,165
The deck looks great at 2 in the
afternoon, the contractor's keen,

90
00:04:20,465 --> 00:04:22,445
the customer says "can you oil it today?"

91
00:04:23,005 --> 00:04:23,565
And he does.

92
00:04:24,125 --> 00:04:27,485
Wet boards, decking oil on top, and he's
sealed the moisture in.

93
00:04:28,765 --> 00:04:32,705
You get peeling, you get black rot
underneath, and you get a phone call in three

94
00:04:32,805 --> 00:04:33,105
months.

95
00:04:33,433 --> 00:04:35,753
What I told someone who asked me this on
the blog was simple.

96
00:04:36,173 --> 00:04:41,353
Yes, oil is fine after sodium
hypochlorite, but allow the decking to dry naturally,

97
00:04:41,553 --> 00:04:45,093
which could take 24 to 48 hours depending
on weather conditions.

98
00:04:45,713 --> 00:04:50,193
Dry timber lets the oil go deep, gives you
an even finish, and that's what protects

99
00:04:50,253 --> 00:04:51,633
against moisture and UV.

100
00:04:52,173 --> 00:04:53,273
So the wait isn't optional.

101
00:04:53,753 --> 00:04:55,893
It's part of the job, and it goes in the
quote.

102
00:04:56,590 --> 00:04:59,030
And that really is the pattern with
natural substrates.

103
00:04:59,470 --> 00:05:01,110
Guesswork kills your margin.

104
00:05:01,670 --> 00:05:04,610
One ruined cedar deck wipes out a month of
good work.

105
00:05:05,609 --> 00:05:10,090
The fix is knowing the why behind each
step, so you can adapt when the weather or

106
00:05:10,130 --> 00:05:11,050
the timber changes.

107
00:05:11,685 --> 00:05:16,125
That's what the SoftWash UK CPD Certified
Softwash Training Course is built for.

108
00:05:16,785 --> 00:05:21,565
Finish it and you get Approved Softwash
Applicator status, and your business goes in

109
00:05:21,605 --> 00:05:26,465
the directory at softwashing.uk, so
customers can find a trained contractor.

110
00:05:27,305 --> 00:05:31,785
Timber stops being the scary job and
starts being repeat work with no disputes.

111
00:05:32,385 --> 00:05:34,985
Wet it first, go weak, wait for it to dry.

112
00:05:35,545 --> 00:05:36,645
That's the whole deck, really.

113
00:05:37,384 --> 00:05:38,485
Right, I'll leave it there.