1
00:00:00,140 --> 00:00:04,380
You know, I, I, I still see it happening
far too often in this industry.

2
00:00:04,900 --> 00:00:08,620
A contractor turns up to a site with a
heavy duty pressure washer,

3
00:00:09,080 --> 00:00:10,360
and they see a black driveway.

4
00:00:10,960 --> 00:00:14,320
And, er, instead of actually inspecting
what's under their boots,

5
00:00:14,440 --> 00:00:16,720
they just assume, well, it's a driveway,
right?

6
00:00:16,860 --> 00:00:20,900
I'll just, I'll just crank the pressure
right up and blast it clean like it's

7
00:00:20,980 --> 00:00:21,940
standard block paving.

8
00:00:22,620 --> 00:00:28,340
And then, within ten minutes, they've
turned a dark, smooth tarmac surface into an

9
00:00:28,440 --> 00:00:31,400
absolute unraveling bed of loose
aggregate.

10
00:00:31,917 --> 00:00:36,697
It, it, it makes my stomach turn because
it's completely avoidable if you understand

11
00:00:36,777 --> 00:00:37,657
basic chemistry.

12
00:00:38,197 --> 00:00:39,777
Tarmac is not concrete.

13
00:00:39,997 --> 00:00:41,797
It's not a rigid solid stone.

14
00:00:42,397 --> 00:00:47,837
Tarmac relies on a petroleum based bitumen
binder to literally glue all that

15
00:00:47,937 --> 00:00:49,297
aggregate and gravel together.

16
00:00:49,877 --> 00:00:53,977
So when you hit tarmac with a high
pressure jet washer, or you go slapping

17
00:00:54,037 --> 00:00:58,017
aggressive solvent degreasers all over it,
what are you actually doing?

18
00:00:58,857 --> 00:01:00,917
You're breaking down that bitumen binder.

19
00:01:01,297 --> 00:01:06,117
According to technical guidance from
SoftWash UK, using excess pressure on tarmac

20
00:01:06,237 --> 00:01:10,657
dislodges that bitumen binder, leaving
loose stones and a patchy,

21
00:01:10,977 --> 00:01:12,157
scarred appearance.

22
00:01:12,718 --> 00:01:15,078
And look, it's not just about high
pressure either.

23
00:01:15,678 --> 00:01:20,718
If you go using neat or ridiculously
strong sodium hypochlorite mixes on weathered

24
00:01:20,858 --> 00:01:25,178
asphalt, or you hold a high pressure lance
two inches from the surface,

25
00:01:25,718 --> 00:01:28,818
you're stripping away that fine top layer
of bitumen.

26
00:01:29,258 --> 00:01:31,818
You're exposing the raw aggregate
underneath.

27
00:01:32,338 --> 00:01:37,178
And once that gravel is exposed, water
gets in, freeze thaw cycles happen,

28
00:01:37,638 --> 00:01:40,678
and the weathering process accelerates by
ten times.

29
00:01:41,118 --> 00:01:44,958
You haven't cleaned the driveway, you've
just destroyed its structural integrity.

30
00:01:46,530 --> 00:01:48,050
I remember a case not long ago.

31
00:01:48,670 --> 00:01:52,910
A contractor was called out to clean an
aged tarmac driveway covered in moss.

32
00:01:53,590 --> 00:01:58,310
He pulled out a 250 bar lance, started
blasting away at full throttle,

33
00:01:58,790 --> 00:02:02,830
and by the time he finished, half the
driveway was lying in loose piles at the

34
00:02:02,850 --> 00:02:03,730
bottom of the slope.

35
00:02:04,170 --> 00:02:08,150
The homeowner handed him a five thousand
pound replacement claim on the spot.

36
00:02:09,049 --> 00:02:10,810
Five thousand pounds.

37
00:02:11,510 --> 00:02:15,550
All because he didn't take two minutes to
identify the surface before pulling the

38
00:02:15,590 --> 00:02:15,890
trigger.

39
00:02:16,203 --> 00:02:20,123
So, how do we clean tarmac safely without
destroying the property owner's

40
00:02:20,163 --> 00:02:20,683
investment?

41
00:02:21,343 --> 00:02:24,943
It comes down to a proper two stage
softwash workflow.

42
00:02:25,623 --> 00:02:27,563
Stage one is physical, but gentle.

43
00:02:28,143 --> 00:02:32,623
You take a specialized scrape or soft
broom and you manually remove the bulk moss

44
00:02:32,663 --> 00:02:34,143
and thick organic growth.

45
00:02:34,763 --> 00:02:38,803
You're not gouging the asphalt, you're
just lifting the heavy biological growth off

46
00:02:38,843 --> 00:02:39,483
the surface.

47
00:02:40,398 --> 00:02:43,078
Stage two is where the chemistry does the
heavy lifting.

48
00:02:43,618 --> 00:02:47,938
Instead of blasting, you apply a low
pressure spray of a residual biocide,

49
00:02:48,458 --> 00:02:52,498
specifically something like DDAC, didecyl
dimethyl ammonium chloride.

50
00:02:53,118 --> 00:02:57,838
A proper DDAC biocide sits on the surface,
kills the biological spores at root

51
00:02:57,878 --> 00:03:01,558
level, and does not attack or degrade the
bitumen binder at all.

52
00:03:02,078 --> 00:03:03,958
It's completely safe for the asphalt.

53
00:03:04,755 --> 00:03:08,315
Now, the key here is managing client
expectations from day one.

54
00:03:08,915 --> 00:03:12,675
You have to explain to the homeowner that
biocide treatments work progressively.

55
00:03:13,315 --> 00:03:17,515
Rain, wind, and natural weathering work
with the product over weeks and months to

56
00:03:17,575 --> 00:03:18,835
self cleanse the surface.

57
00:03:19,555 --> 00:03:23,515
When you educate the customer on why this
gentle process protects their driveway

58
00:03:23,535 --> 00:03:27,255
from five thousand pounds worth of damage,
you don't just win the job,

59
00:03:27,695 --> 00:03:30,315
you set up a recurring annual maintenance
contract.

60
00:03:30,915 --> 00:03:32,955
Of course, site control matters too.

61
00:03:33,555 --> 00:03:37,795
Before you apply anything, inspect the
site for pre existing oil saturation,

62
00:03:38,315 --> 00:03:40,415
because oil already weakens bitumen.

63
00:03:41,075 --> 00:03:42,195
Check your drainage routes.

64
00:03:42,675 --> 00:03:46,535
You need to control run off so chemical
wash water doesn't flow onto sensitive

65
00:03:46,615 --> 00:03:49,755
lawns, flowerbeds, or into freshwater
drains.

66
00:03:50,455 --> 00:03:54,315
Simple site checks protect you, the
client, and the environment.

67
00:03:55,160 --> 00:03:59,240
Professional exterior cleaning isn't about
brute force or blasting everything in

68
00:03:59,300 --> 00:03:59,620
sight.

69
00:04:00,160 --> 00:04:04,260
It's about knowledge, compliance, and
using the right chemistry for the right

70
00:04:04,380 --> 00:04:04,840
surface.

71
00:04:05,600 --> 00:04:09,240
If you want to build a reputable, highly
profitable softwashing business,

72
00:04:09,720 --> 00:04:15,200
come and take a look at our SoftWash UK
CPD Certified Softwash Training Course and

73
00:04:15,260 --> 00:04:19,680
join our Approved Softwash Applicator
network at softwashing.uk.

74
00:04:20,360 --> 00:04:24,060
Get the knowledge first, protect your
business, and do the job right.

