1
00:00:00,260 --> 00:00:05,140
Let's start at about a quarter to twelve
on an ordinary working day at a combined

2
00:00:05,220 --> 00:00:07,420
cycle power plant that's still being
built.

3
00:00:08,320 --> 00:00:11,380
Module 3, gas turbine GT31.

4
00:00:12,540 --> 00:00:17,580
A tower crane is holding a steel roof beam
in the air at about 17.5 metres.

5
00:00:18,360 --> 00:00:22,420
It's two sections, bolted together on the
ground, around sixteen metres long,

6
00:00:22,780 --> 00:00:25,260
and it weighs 5.701 tonnes.

7
00:00:26,000 --> 00:00:31,060
Beam A is 3.529 tonnes, Beam B is 2.172.

8
00:00:32,159 --> 00:00:35,840
Hanging under the crane hook, it's a very
large, very still object,

9
00:00:36,420 --> 00:00:39,540
and for the next few minutes everything
about the job looks normal.

10
00:00:40,448 --> 00:00:43,868
Underneath it, a basket on a mobile
elevated work platform,

11
00:00:44,148 --> 00:00:46,028
a MEWP, is moving into position.

12
00:00:46,768 --> 00:00:48,408
Two steel fixers are in the basket.

13
00:00:48,948 --> 00:00:53,228
We'll call them Fixer 1 and Fixer 2,
because the report doesn't name the man who

14
00:00:53,268 --> 00:00:56,588
died, out of respect for him and his
family, and we're going to follow that.

15
00:00:57,608 --> 00:00:59,928
Fixer 1 is standing at the basket
controls.

16
00:01:00,388 --> 00:01:02,328
Fixer 2 is kneeling, collecting bolts.

17
00:01:03,048 --> 00:01:06,088
Their job is to bolt that beam into its
final position.

18
00:01:07,175 --> 00:01:10,475
This is a case study from an independent
third party investigation,

19
00:01:10,795 --> 00:01:14,955
Version 2.0, which supersedes the
Consortium's own internal report.

20
00:01:15,655 --> 00:01:19,155
We'll come back to why that matters,
because the two reports disagree about

21
00:01:19,215 --> 00:01:20,235
something fundamental.

22
00:01:21,235 --> 00:01:23,075
And a warning about the shape of this
story.

23
00:01:23,775 --> 00:01:27,655
It lasts, by the reconstruction, between
sixty and ninety seconds.

24
00:01:28,415 --> 00:01:31,815
But the reason it happened was built over
weeks, in planning,

25
00:01:32,115 --> 00:01:34,175
in supervision, in a purchasing office.

26
00:01:34,935 --> 00:01:35,915
So we'll go slowly.

27
00:01:36,467 --> 00:01:40,787
Before the sequence, I want the cast and
the setting, because the setting is what

28
00:01:40,867 --> 00:01:41,367
stopped me.

29
00:01:41,987 --> 00:01:45,127
The report is clear that this wasn't a
chaotic site.

30
00:01:45,687 --> 00:01:47,367
The work area was set up correctly.

31
00:01:47,707 --> 00:01:51,687
There was a defined lifting zone, hard
barricading, a briefed workforce.

32
00:01:52,227 --> 00:01:55,627
The tower crane had been third party
certified shortly before,

33
00:01:55,767 --> 00:01:59,767
with no issues recorded, and the morning
inspection found no defects.

34
00:02:00,407 --> 00:02:03,587
The slings were in date against the
project's inspection regime,

35
00:02:03,727 --> 00:02:04,987
and they carried tags.

36
00:02:05,667 --> 00:02:10,486
A rescue MEWP was standing off to one
side, positioned in advance as a dedicated

37
00:02:10,546 --> 00:02:12,107
rescue from height platform.

38
00:02:12,915 --> 00:02:16,935
The work group was a supervisor, two steel
fixers, two riggers,

39
00:02:17,455 --> 00:02:22,855
a tower crane operator, a MEWP operator,
and two standby emergency response

40
00:02:22,915 --> 00:02:23,435
personnel.

41
00:02:24,395 --> 00:02:28,415
The day started at eight with a pre task
risk briefing and equipment checks.

42
00:02:28,975 --> 00:02:33,075
The task began at nine, with the beam
rigged and lifted towards its position.

43
00:02:34,135 --> 00:02:39,795
So by the time we reach 11:45, nearly
three hours of ordinary work have gone by.

44
00:02:40,495 --> 00:02:43,675
And the report says the crew was long
standing and experienced.

45
00:02:44,175 --> 00:02:48,555
All of them had their competencies
assessed through the HR process and had the site

46
00:02:48,655 --> 00:02:49,635
specific induction.

47
00:02:50,563 --> 00:02:54,383
Which is exactly the sort of thing you'd
read in a file and feel reassured by.

48
00:02:55,143 --> 00:02:59,963
Trained, inducted, certified crane, tagged
slings, barricades.

49
00:03:00,983 --> 00:03:04,083
If you'd walked past that morning with a
clipboard, you could have ticked most of

50
00:03:04,123 --> 00:03:04,263
it.

51
00:03:04,913 --> 00:03:09,533
And I think that's the uncomfortable part,
because the lifting plan itself was

52
00:03:09,593 --> 00:03:09,993
right.

53
00:03:10,613 --> 00:03:14,953
The plan and the risk assessment said the
two fixers were to approach the beam in

54
00:03:14,993 --> 00:03:16,453
the basket from the side.

55
00:03:17,093 --> 00:03:21,613
And it says, in terms, that the basket was
never to be positioned beneath the

56
00:03:21,653 --> 00:03:22,593
suspended load.

57
00:03:22,853 --> 00:03:24,693
The no load overhead rule.

58
00:03:25,153 --> 00:03:25,933
It was written down.

59
00:03:26,608 --> 00:03:30,888
So the plan said side approach, and the
basket went underneath.

60
00:03:31,630 --> 00:03:36,150
The basket was positioned directly beneath
the beam and was being raised towards it.

61
00:03:36,970 --> 00:03:42,370
The report's wording is that the rule
existed on paper, but was not enforced by any

62
00:03:42,490 --> 00:03:46,670
hold point, and no independent spotter
checked the basket's position before the

63
00:03:46,730 --> 00:03:47,170
approach.

64
00:03:48,190 --> 00:03:50,290
That's a phrase I'd like listeners to hold
onto.

65
00:03:51,090 --> 00:03:55,330
A hold point is a place in the job where
it physically cannot go forward until

66
00:03:55,390 --> 00:03:56,610
somebody confirms something.

67
00:03:57,270 --> 00:04:01,490
A spotter is a person whose only task is
to look at exactly that.

68
00:04:02,210 --> 00:04:03,230
Neither existed.

69
00:04:03,850 --> 00:04:06,870
If you've heard our earlier episode about
rejecting paper closures,

70
00:04:07,330 --> 00:04:08,370
this is a cousin of it.

71
00:04:08,910 --> 00:04:11,970
A control that lives in a document and
nowhere else.

72
00:04:12,630 --> 00:04:13,690
I'd put it like this.

73
00:04:14,450 --> 00:04:19,690
A rule without a hold point is a bit like
a speed limit sign on a road with no speed

74
00:04:19,750 --> 00:04:23,770
cameras, no police, and a perfectly
straight, empty stretch.

75
00:04:24,610 --> 00:04:26,070
Everybody knows the number.

76
00:04:26,890 --> 00:04:31,510
Nothing at all makes the number matter at
the moment you're tempted to ignore it.

77
00:04:32,550 --> 00:04:36,310
And I'll flag now that the report says
this isn't about blaming individuals.

78
00:04:36,850 --> 00:04:42,270
It explicitly does not apportion
individual blame or determine civil or criminal

79
00:04:42,330 --> 00:04:43,010
liability.

80
00:04:43,790 --> 00:04:47,330
It's asking why the system let this
position be reached.

81
00:04:48,390 --> 00:04:50,390
So let's walk through the minute and a
half.

82
00:04:51,110 --> 00:04:55,170
I'll take the sequence as the report
reconstructs it, and I'll try to flag where it

83
00:04:55,230 --> 00:04:58,670
says something is inference, because a few
key points are.

84
00:04:59,825 --> 00:05:01,045
The beam is hanging.

85
00:05:01,585 --> 00:05:03,125
The basket is underneath it.

86
00:05:03,925 --> 00:05:06,345
Now, two things are moving at the same
time.

87
00:05:07,005 --> 00:05:10,165
The crane is lowering the beam the final
distance into position.

88
00:05:10,665 --> 00:05:13,005
And the basket is being raised towards it.

89
00:05:13,885 --> 00:05:16,985
Two converging motions, controlled by two
different people,

90
00:05:17,465 --> 00:05:20,965
and the report's phrase is that neither
was commanding the other.

91
00:05:21,665 --> 00:05:25,805
Nobody held sole authority to command the
combined operation,

92
00:05:26,185 --> 00:05:28,745
and nobody could stop the lot with one
word.

93
00:05:29,837 --> 00:05:31,917
The beam contacts the top of the basket.

94
00:05:32,577 --> 00:05:35,297
And here's the first mechanical hinge in
the story.

95
00:05:36,017 --> 00:05:41,437
The upward push of the rising basket
against the descending beam reduces the tension

96
00:05:41,497 --> 00:05:42,237
in the slings.

97
00:05:43,057 --> 00:05:45,717
The beam is no longer hanging purely from
the crane.

98
00:05:46,177 --> 00:05:50,077
Part of its weight is being carried, or at
least resisted, from below.

99
00:05:51,078 --> 00:05:55,518
With tension gone, the slings, which were
an unchoked wrap with no effective edge

100
00:05:55,558 --> 00:05:57,818
protection, slide along the steel.

101
00:05:58,478 --> 00:06:01,898
The loaded webbing abrades against the
sharp edges of the beam.

102
00:06:02,678 --> 00:06:04,098
The first sling fails.

103
00:06:05,018 --> 00:06:06,738
Now, the report is open about this.

104
00:06:07,158 --> 00:06:12,398
The precise mechanism by which the first
sling slid and failed is reconstructed from

105
00:06:12,458 --> 00:06:17,038
physical evidence and from witnesses, and
it's identified as inference.

106
00:06:17,838 --> 00:06:21,978
The physical evidence includes slide marks
along the beam, paint transfer on the

107
00:06:22,038 --> 00:06:24,858
adjacent girder, and the fractured sling
ends.

108
00:06:25,395 --> 00:06:29,595
And that's the moment where I want to slow
down, because of what the ground operator

109
00:06:29,635 --> 00:06:30,055
is doing.

110
00:06:30,935 --> 00:06:33,315
The basket is not being driven by the
people in it.

111
00:06:33,655 --> 00:06:37,815
It's being driven from the ground level
controls by a separate operator standing on

112
00:06:37,855 --> 00:06:38,275
the ground.

113
00:06:38,915 --> 00:06:43,535
And that operator keeps raising the basket
until the first sling is heard to snap.

114
00:06:44,395 --> 00:06:48,515
The report says the snap is coincident
with the sound of the basket handrail steel

115
00:06:48,575 --> 00:06:49,735
cracking under the beam.

116
00:06:50,653 --> 00:06:52,533
That coincidence is important evidence.

117
00:06:53,233 --> 00:06:57,433
It tells the investigators the basket was
still being driven up against the beam at

118
00:06:57,473 --> 00:06:59,013
the instant the rigging let go.

119
00:06:59,733 --> 00:07:02,413
It wasn't a basket that had stopped and
then got hit.

120
00:07:02,893 --> 00:07:03,593
It was pushing.

121
00:07:04,550 --> 00:07:05,330
And then?

122
00:07:06,212 --> 00:07:08,772
The beam settles onto the handrails, and
then through them.

123
00:07:09,512 --> 00:07:12,532
Fixer 1, who's at the basket controls, is
crushed against them.

124
00:07:13,132 --> 00:07:17,312
The report records catastrophic abdominal
trauma consistent with a severe crushing

125
00:07:17,352 --> 00:07:17,812
mechanism.

126
00:07:18,712 --> 00:07:22,592
Fixer 2 is kneeling in the same basket,
and he gets himself out.

127
00:07:23,172 --> 00:07:26,452
He strips out of his harness and climbs
clear onto adjacent steelwork.

128
00:07:26,992 --> 00:07:28,012
Minor injuries only.

129
00:07:28,592 --> 00:07:30,532
Meanwhile the beam hasn't finished.

130
00:07:30,992 --> 00:07:35,892
The first sling has gone, so the entire
load transfers to the single remaining

131
00:07:35,972 --> 00:07:37,632
sling, on the heavier section.

132
00:07:38,292 --> 00:07:43,652
The beam swings towards its centre of
gravity, and in swinging it drives the basket

133
00:07:43,712 --> 00:07:46,152
and its arm downwards and strikes a
girder.

134
00:07:46,832 --> 00:07:49,572
The second sling is overloaded, and it
fails.

135
00:07:50,052 --> 00:07:53,792
The beam falls about 17.5 metres to the
ground.

136
00:07:54,628 --> 00:07:57,828
There's a detail from a rigger that I find
hard to listen to,

137
00:07:57,968 --> 00:07:59,188
and also useful.

138
00:07:59,988 --> 00:08:03,128
He reported hearing three distinct sounds
in sequence.

139
00:08:03,648 --> 00:08:09,068
A crushing metallic sound, then steel on
steel, then an impact on concrete.

140
00:08:09,808 --> 00:08:13,648
The investigators match those to the
basket crush, the beam hitting the girder,

141
00:08:14,048 --> 00:08:14,988
and the ground impact.

142
00:08:15,908 --> 00:08:20,348
And independently, the crane operator
reported feeling no abnormal crane movement

143
00:08:20,408 --> 00:08:24,668
until the first sling snapped, and then
felt the jib move seconds later as the

144
00:08:24,728 --> 00:08:25,728
second sling failed.

145
00:08:26,488 --> 00:08:30,008
The report treats these separate accounts
as corroborating the reconstruction.

146
00:08:30,927 --> 00:08:36,107
Two witnesses with no way to compare
notes, both describing the same ordering of

147
00:08:36,147 --> 00:08:36,547
events.

148
00:08:37,247 --> 00:08:40,747
I'd say that's about as good as it gets in
a case where access was limited.

149
00:08:41,527 --> 00:08:44,427
And we should be plain about the limits,
because the report is.

150
00:08:45,167 --> 00:08:49,807
Access to the GT31 area was restricted
pending the civil police investigation,

151
00:08:50,327 --> 00:08:53,367
so a complete physical re-examination
wasn't possible.

152
00:08:53,987 --> 00:08:57,147
The government's written sling test report
and the police file were still

153
00:08:57,207 --> 00:08:58,587
outstanding at the date of issue.

154
00:08:59,187 --> 00:09:02,907
And the ground MEWP operator provided no
statement.

155
00:09:03,762 --> 00:09:05,982
That last one matters for how we talk
about him.

156
00:09:06,402 --> 00:09:10,382
The account of how that platform was
operated is built from the other witnesses and

157
00:09:10,422 --> 00:09:11,382
the physical evidence.

158
00:09:11,922 --> 00:09:15,822
We don't know what he saw, what he heard,
or what he was told over a radio,

159
00:09:16,202 --> 00:09:17,622
or whether he was on one at all.

160
00:09:18,242 --> 00:09:22,582
The report says the position of the ground
operator within the communication chain

161
00:09:22,642 --> 00:09:24,422
was unclear and uncorroborated.

162
00:09:24,982 --> 00:09:29,502
So whenever we say what he could or
couldn't perceive, that's the machine's geometry

163
00:09:29,542 --> 00:09:31,042
talking, not his testimony.

164
00:09:31,662 --> 00:09:32,022
Fair.

165
00:09:32,682 --> 00:09:35,762
And then the aftermath, in the report's
timeline.

166
00:09:36,522 --> 00:09:39,042
About 11:48 is the incident.

167
00:09:39,942 --> 00:09:45,902
At 11:50 the emergency response starts,
with a senior HSE person on site as first

168
00:09:45,942 --> 00:09:46,402
responder.

169
00:09:47,402 --> 00:09:52,542
At 11:51 the site clinic gets the
emergency call, and an ambulance,

170
00:09:52,682 --> 00:09:54,802
a nurse and a physician are dispatched.

171
00:09:55,782 --> 00:09:59,662
At 12:15 the site physician pronounces
Fixer 1 dead.

172
00:10:00,942 --> 00:10:05,222
The labour office and the police are
informed at 13:00.

173
00:10:05,262 --> 00:10:09,862
And from half past one until six that
evening, the Consortium's management meets,

174
00:10:10,142 --> 00:10:13,542
appoints an investigation team, and starts
collecting facts.

175
00:10:14,325 --> 00:10:15,505
So that's the event.

176
00:10:16,185 --> 00:10:17,685
Now the interesting question.

177
00:10:18,385 --> 00:10:23,205
Why was a basket under a beam, driven from
the ground, with slings that could slide?

178
00:10:24,053 --> 00:10:28,133
I'll start with the machine, because the
report treats it as a fundamental defect in

179
00:10:28,153 --> 00:10:29,233
the safe system of work.

180
00:10:30,173 --> 00:10:32,273
A MEWP has two sets of controls.

181
00:10:32,773 --> 00:10:34,433
The upper controls are in the basket.

182
00:10:34,793 --> 00:10:36,793
That's how the machine is normally
operated.

183
00:10:37,333 --> 00:10:42,273
The person stands in the basket, moves
with it, and has a first person line of sight

184
00:10:42,333 --> 00:10:46,713
and a physical feel for what the platform
is doing, so they can position it safely

185
00:10:46,773 --> 00:10:48,053
and stop it instantly.

186
00:10:49,037 --> 00:10:52,737
The lower controls, at ground level, are
for emergency recovery.

187
00:10:53,237 --> 00:10:56,717
Principally, to lower a basket whose
occupant is incapacitated.

188
00:10:57,337 --> 00:10:58,937
And for testing and maintenance.

189
00:10:59,457 --> 00:11:03,577
They are not intended for routine
positioning of an occupied basket during

190
00:11:03,597 --> 00:11:04,457
production work.

191
00:11:05,297 --> 00:11:08,437
The report says that contradicts the
machine's design intent,

192
00:11:08,857 --> 00:11:12,437
the manufacturer's instructions for use,
and recognised guidance.

193
00:11:12,997 --> 00:11:18,277
It engages the Provision and Use of Work
Equipment Regulations 1998 and the standard

194
00:11:18,377 --> 00:11:19,937
EN 280 for MEWPs.

195
00:11:20,942 --> 00:11:22,262
And the line that struck me.

196
00:11:22,922 --> 00:11:27,262
On this project, operating the MEWP from
the ground controls was recorded as

197
00:11:27,382 --> 00:11:28,382
standard practice.

198
00:11:29,002 --> 00:11:29,722
Not a one off.

199
00:11:30,222 --> 00:11:31,782
Not a shortcut taken in a hurry.

200
00:11:32,362 --> 00:11:33,242
Standard practice.

201
00:11:33,993 --> 00:11:36,233
That changes how I read the ground
operator, honestly.

202
00:11:36,633 --> 00:11:40,633
Because if it's how every basket was
moved, then he wasn't doing something odd that

203
00:11:40,693 --> 00:11:40,913
day.

204
00:11:41,413 --> 00:11:44,073
He was doing the job the way the project
did the job.

205
00:11:44,693 --> 00:11:46,293
That's the report's reading, yes.

206
00:11:46,853 --> 00:11:49,633
And the engineering consequence is quite
simple.

207
00:11:50,293 --> 00:11:52,693
Think about what the ground operator can
perceive.

208
00:11:53,173 --> 00:11:57,233
He's standing on the ground, looking up at
a beam and a basket converging,

209
00:11:57,733 --> 00:11:58,753
from an oblique angle.

210
00:11:59,353 --> 00:12:01,873
He can't see the contact as the occupants
would.

211
00:12:02,373 --> 00:12:05,473
He can't feel the movement of the platform
through the basket.

212
00:12:06,493 --> 00:12:12,293
The report puts it as the remote operator
being unable to perceive or arrest the

213
00:12:12,333 --> 00:12:12,933
entrapment.

214
00:12:13,633 --> 00:12:16,773
And the people who could perceive it, the
two fixers in the basket,

215
00:12:17,233 --> 00:12:18,813
had no control of the machine.

216
00:12:19,607 --> 00:12:21,187
I keep reaching for a comparison.

217
00:12:21,707 --> 00:12:25,607
It's like parking a car by having someone
stand outside the vehicle holding the

218
00:12:25,667 --> 00:12:29,767
pedals, while the driver sits inside
holding the wheel, and the person with the

219
00:12:29,827 --> 00:12:32,167
pedals is looking at the car from forty
feet away.

220
00:12:32,867 --> 00:12:36,447
The person who can see the wall can't
brake, and the person who can brake can't see

221
00:12:36,487 --> 00:12:36,947
the wall.

222
00:12:37,567 --> 00:12:39,727
Nothing about that is a mechanical
failure.

223
00:12:40,047 --> 00:12:41,127
Every part of it works.

224
00:12:41,778 --> 00:12:47,317
And the report does say there's no
evidence of mechanical MEWP failure beforehand.

225
00:12:48,118 --> 00:12:52,778
The knuckle boom and pin housing were
deformed in a way consistent with a downward

226
00:12:52,858 --> 00:12:56,278
force applied to the top of the basket,
the descending beam,

227
00:12:57,018 --> 00:13:00,198
and the cracked handrail fits the beam
bearing down on it.

228
00:13:01,058 --> 00:13:02,958
So the machine did what it was told.

229
00:13:03,438 --> 00:13:07,138
The report's own judgement is that if the
platform had been operated from the

230
00:13:07,198 --> 00:13:11,778
basket, or if the approach had simply
stopped short of the load as the plan

231
00:13:11,818 --> 00:13:16,838
required, the entrapment would in all
likelihood have been perceived and arrested

232
00:13:16,898 --> 00:13:19,178
before the slings were unloaded and slid.

233
00:13:19,910 --> 00:13:23,770
Now the rigging, because that's where the
two reports part company.

234
00:13:24,490 --> 00:13:30,130
The Consortium's own internal report,
version 1.0, described a single choke

235
00:13:30,190 --> 00:13:33,330
configuration, with nylon packing
protecting the slings.

236
00:13:33,970 --> 00:13:37,230
The independent investigation says that
description was wrong.

237
00:13:37,830 --> 00:13:41,650
What was actually used was a simple wrap
around each lifting point.

238
00:13:42,370 --> 00:13:47,050
The load hung from two six metre nylon
slings and a bow shackle at the hook.

239
00:13:47,790 --> 00:13:48,790
No choke hitch.

240
00:13:49,210 --> 00:13:52,690
And no effective edge protection where the
slings bore on the steel.

241
00:13:53,677 --> 00:13:58,217
The report calls this difference central
to the failure, and I want to explain why,

242
00:13:58,517 --> 00:14:02,837
because it's the sort of detail that
sounds like a pedantic correction and turns out

243
00:14:02,897 --> 00:14:04,097
to be the whole mechanism.

244
00:14:04,977 --> 00:14:08,717
A choke hitch tightens onto the load as
tension is applied.

245
00:14:09,197 --> 00:14:09,917
It grips.

246
00:14:10,477 --> 00:14:14,577
If the tension drops for a moment, the
sling still has a bite on the beam.

247
00:14:15,357 --> 00:14:17,617
A simple wrap has no grip at all.

248
00:14:18,177 --> 00:14:21,857
It relies on geometry and continuous
tension to stay where it is.

249
00:14:22,617 --> 00:14:26,677
Take the tension away and there's nothing
holding the sling in place along a smooth

250
00:14:26,757 --> 00:14:27,457
steel member.

251
00:14:28,172 --> 00:14:32,332
And the tension was taken away,
deliberately in one sense.

252
00:14:32,912 --> 00:14:35,832
The report's table of good practice has a
line about it.

253
00:14:36,452 --> 00:14:40,092
Maintain sling tension and control of the
load through the lift,

254
00:14:40,592 --> 00:14:43,732
and avoid relieving tension while
personnel are exposed.

255
00:14:44,512 --> 00:14:49,392
What they found was that tension was
relieved by raising the basket up into the load

256
00:14:49,752 --> 00:14:50,912
while the crane was lowering.

257
00:14:51,732 --> 00:14:52,732
Now, I'd be careful.

258
00:14:53,252 --> 00:14:56,012
I don't think anyone set out to relieve
the tension.

259
00:14:56,512 --> 00:14:59,032
It's the outcome of the two converging
motions.

260
00:14:59,898 --> 00:15:00,318
Agreed.

261
00:15:00,658 --> 00:15:02,538
That's the report's logic, not intent.

262
00:15:03,058 --> 00:15:04,678
The two motions together did it.

263
00:15:05,412 --> 00:15:06,752
And then the edges.

264
00:15:07,492 --> 00:15:12,492
Soft nylon is very vulnerable to cutting
where it passes over the sharp arris of

265
00:15:12,572 --> 00:15:13,492
structural steel.

266
00:15:14,512 --> 00:15:19,392
Recognised practice is to protect the
sling from any cutting edge over the whole

267
00:15:19,452 --> 00:15:21,952
contact length and throughout any
movement.

268
00:15:22,832 --> 00:15:27,072
The investigators found no effective edge
protection on the failed leg.

269
00:15:27,912 --> 00:15:31,832
The original report's packing was either
absent or inadequate.

270
00:15:32,412 --> 00:15:37,972
So once the wrap began to slide under
partial load, the webbing was abraded and cut.

271
00:15:39,060 --> 00:15:41,120
There's also the matter of the load
itself.

272
00:15:41,980 --> 00:15:45,880
The report, citing the LEEA codes of
practice, says a long,

273
00:15:46,080 --> 00:15:51,520
asymmetric, two section beam needs a
secured hitch, a choke or a double choke,

274
00:15:51,840 --> 00:15:53,120
and not a simple wrap.

275
00:15:53,880 --> 00:15:57,840
And it concludes that the technique
applied was incorrect for the load,

276
00:15:58,360 --> 00:16:02,900
which points to a competence and
supervision gap, not just a single rigger's choice

277
00:16:02,960 --> 00:16:03,440
on the day.

278
00:16:04,090 --> 00:16:09,810
Now the slings themselves, and this is
where the story widens from the crane hook to

279
00:16:09,870 --> 00:16:11,390
a purchasing office somewhere.

280
00:16:12,070 --> 00:16:13,910
Each sling carried a tag.

281
00:16:14,510 --> 00:16:20,550
The tag said EN 1492 part 1, a five tonne
working load limit,

282
00:16:21,010 --> 00:16:23,230
and a seven to one design factor.

283
00:16:24,330 --> 00:16:28,690
Seven to one means that a sling marked at
five tonnes should not break until it's

284
00:16:28,770 --> 00:16:30,610
pulled at around seven times that.

285
00:16:30,990 --> 00:16:32,550
About 35 tonnes.

286
00:16:33,882 --> 00:16:38,302
What the investigators found is that the
slings could not be shown to conform to the

287
00:16:38,362 --> 00:16:39,462
marking they carried.

288
00:16:40,242 --> 00:16:41,922
They'd been manufactured in China.

289
00:16:42,222 --> 00:16:45,002
They bore no CE mark and no Kitemark.

290
00:16:45,482 --> 00:16:47,602
There was no Declaration of Conformity.

291
00:16:48,422 --> 00:16:54,222
The only paperwork was a single A5
document presented as a factory test certificate.

292
00:16:55,175 --> 00:17:00,135
The report spells out what a proper
Declaration of Conformity must contain for a

293
00:17:00,215 --> 00:17:01,475
textile lifting sling.

294
00:17:02,015 --> 00:17:06,815
It has to identify the manufacturer, the
unique serial numbers of those exact

295
00:17:06,895 --> 00:17:13,415
slings, the specific standard they were
made to, for example BS EN 1492 part 1,

296
00:17:14,155 --> 00:17:16,655
and a legal signature from the responsible
person.

297
00:17:17,275 --> 00:17:20,175
A generic A5 flyer meets none of those.

298
00:17:20,815 --> 00:17:24,775
So the tag said one thing, and nothing
behind the tag could prove it.

299
00:17:25,637 --> 00:17:26,637
Then comes the test.

300
00:17:27,297 --> 00:17:31,957
After the failure, slings from the same
batch went for independent tensile testing

301
00:17:32,017 --> 00:17:33,117
at a government facility.

302
00:17:33,837 --> 00:17:36,657
Sling one failed at 13.3 tonnes.

303
00:17:37,337 --> 00:17:39,857
Sling two failed at 11.6 tonnes.

304
00:17:40,837 --> 00:17:44,537
The manufacturer's destructive test
certificate, supplied with the batch,

305
00:17:44,937 --> 00:17:47,277
claimed a peak of about 35 tonnes.

306
00:17:47,837 --> 00:17:49,817
A gap of roughly 20 tonnes.

307
00:17:50,485 --> 00:17:53,825
And we need to hold the qualifiers there,
because the report does.

308
00:17:54,365 --> 00:17:58,265
Those government figures are preliminary,
and the written report from the government

309
00:17:58,305 --> 00:18:02,825
facility was described as inconclusive and
outstanding at the date of issue.

310
00:18:03,725 --> 00:18:08,185
The discrepancy is listed as unresolved,
with quality verification required.

311
00:18:08,945 --> 00:18:13,805
So the numbers are real test results as
reported, but the final word isn't in.

312
00:18:14,525 --> 00:18:18,785
What the investigators say is that the
figures are consistent with a sling whose

313
00:18:18,885 --> 00:18:22,765
true safety factor was a small fraction of
the assumed seven to one.

314
00:18:23,587 --> 00:18:27,647
Here's what I find genuinely striking, and
it's the report's own caution.

315
00:18:28,407 --> 00:18:31,647
You might expect it to say the slings
killed him, and be done.

316
00:18:32,307 --> 00:18:32,807
It doesn't.

317
00:18:33,527 --> 00:18:37,347
It says that even a fully compliant sling
would likely also have failed once it

318
00:18:37,387 --> 00:18:41,327
began sliding across an unprotected sharp
edge under partial load.

319
00:18:42,027 --> 00:18:45,867
So the nonconforming slings are called a
serious contributing cause,

320
00:18:46,367 --> 00:18:48,267
not the sole or primary cause.

321
00:18:48,985 --> 00:18:54,205
Which I think is the honest version, and a
useful corrective to the instinct that

322
00:18:54,285 --> 00:18:56,345
every accident needs one villain.

323
00:18:57,065 --> 00:18:58,925
Because there's a real temptation here.

324
00:18:59,545 --> 00:19:02,505
Foreign made slings, a dodgy flyer, case
closed.

325
00:19:03,345 --> 00:19:04,705
The report refuses that.

326
00:19:05,185 --> 00:19:09,485
It says the procurement and goods inwards
controls that should have verified

327
00:19:09,505 --> 00:19:13,765
conformity and rejected unverified imports
did not operate.

328
00:19:14,405 --> 00:19:18,705
That's a systemic failing in its own
right, independent of the slinging technique.

329
00:19:19,800 --> 00:19:22,520
And tied to something from our episode on
barrier testing.

330
00:19:23,160 --> 00:19:26,040
A barrier you've never tested is a barrier
you're assuming.

331
00:19:26,800 --> 00:19:29,500
The sling's tag was an assumption about 35
tonnes.

332
00:19:30,120 --> 00:19:33,420
Nobody had tested that assumption until
the batch went to a government laboratory,

333
00:19:34,060 --> 00:19:36,160
after the beam was already on the ground.

334
00:19:36,778 --> 00:19:40,238
Let me add the communication thread,
because it's the smaller,

335
00:19:40,518 --> 00:19:42,598
quieter failure and it matters.

336
00:19:43,458 --> 00:19:47,118
The crane operator and the riggers talked
by handheld radio,

337
00:19:47,578 --> 00:19:49,318
and reported no radio problems.

338
00:19:50,138 --> 00:19:54,238
But Fixer 2 stated that he'd been in radio
contact with one rigger.

339
00:19:55,058 --> 00:19:58,658
That rigger denied it, saying hand and
verbal signals were used.

340
00:19:59,358 --> 00:20:03,658
And the ground MEWP operator's place in
the chain was unclear.

341
00:20:04,513 --> 00:20:06,573
The report doesn't claim to know who is
right.

342
00:20:07,053 --> 00:20:08,953
It draws a narrower conclusion.

343
00:20:09,793 --> 00:20:13,553
If two people on the same lift remember
different communication methods,

344
00:20:13,973 --> 00:20:17,593
then no single protocol had been mandated
for the combined lift.

345
00:20:18,393 --> 00:20:23,933
And the authority to stop the lift wasn't
unambiguous or exercisable by any team

346
00:20:23,993 --> 00:20:25,173
member who saw danger.

347
00:20:25,873 --> 00:20:26,853
Which fits the rest.

348
00:20:27,393 --> 00:20:29,873
The raise continued until the sling
snapped.

349
00:20:30,863 --> 00:20:35,403
Stop authority is a lovely example of a
barrier you can't see until you need it.

350
00:20:36,023 --> 00:20:38,023
Everyone assumes anyone can shout stop.

351
00:20:38,583 --> 00:20:41,723
But if the people who can see the problem
aren't on the same channel as the person

352
00:20:41,743 --> 00:20:44,303
with the controls, shouting stop is just
noise.

353
00:20:44,985 --> 00:20:48,265
The investigators didn't trust one method
to explain this.

354
00:20:48,705 --> 00:20:50,905
They used four, and triangulated.

355
00:20:51,785 --> 00:20:57,885
Barrier analysis, a bow tie, a TapRooT
style causal tree, and a fault tree.

356
00:20:58,825 --> 00:21:03,025
I'd like to give each a moment, because
each one shows a different face of the same

357
00:21:03,085 --> 00:21:03,405
event.

358
00:21:04,975 --> 00:21:08,935
The barrier analysis lists nine intended
defences in order,

359
00:21:09,355 --> 00:21:13,415
from the earliest chance to prevent the
event to the last chance to limit the harm.

360
00:21:14,074 --> 00:21:15,394
And it marks each one.

361
00:21:16,655 --> 00:21:18,715
The no load overhead rule: failed.

362
00:21:19,275 --> 00:21:21,055
It was on paper and not enforced.

363
00:21:21,975 --> 00:21:24,815
The independent spotter or hold point:
absent.

364
00:21:25,675 --> 00:21:28,495
Basket control operation of the MEWP:
absent.

365
00:21:29,275 --> 00:21:32,755
Single point command and sequencing of the
crane and the MEWP: failed.

366
00:21:33,635 --> 00:21:36,615
Correct, edge protected, secured rigging:
failed.

367
00:21:37,315 --> 00:21:40,575
A verified seven to one sling capacity:
unreliable.

368
00:21:41,175 --> 00:21:43,595
The authority to stop the lift: degraded.

369
00:21:44,235 --> 00:21:49,455
Then two mitigative barriers: the
barricaded drop zone, effective,

370
00:21:49,995 --> 00:21:53,695
and the standby rescue MEWP with prompt
medical response, effective.

371
00:21:54,585 --> 00:21:57,125
And the report's finding on that table is
blunt.

372
00:21:57,805 --> 00:22:01,845
Every preventive barrier between the work
group and the fatality had failed,

373
00:22:02,205 --> 00:22:05,885
was absent, or was degraded before anyone
was placed beneath the load.

374
00:22:06,665 --> 00:22:09,805
The only things that worked were the ones
that act after the release.

375
00:22:10,345 --> 00:22:11,365
They limited the harm.

376
00:22:11,865 --> 00:22:13,425
They couldn't prevent the fatal contact.

377
00:22:14,100 --> 00:22:17,280
Which is the Swiss cheese picture we've
talked about before,

378
00:22:17,700 --> 00:22:19,500
but taken to an extreme.

379
00:22:20,420 --> 00:22:24,980
In the usual picture, the holes in the
slices line up occasionally and rarely.

380
00:22:25,740 --> 00:22:27,660
Here the slices weren't just holed.

381
00:22:28,180 --> 00:22:30,300
Several of them weren't in the stack at
all.

382
00:22:31,453 --> 00:22:33,533
The bow tie shows the same thing as a
shape.

383
00:22:33,953 --> 00:22:39,633
Hazard in the middle, a suspended beam of
about 5.7 tonnes at about 17.5 metres with

384
00:22:39,673 --> 00:22:41,213
people working at height below it.

385
00:22:42,053 --> 00:22:44,493
Threats on the left, each with its
preventive barriers.

386
00:22:44,953 --> 00:22:46,073
A person beneath the load.

387
00:22:46,433 --> 00:22:47,973
A basket driven into the load.

388
00:22:48,513 --> 00:22:49,913
Rigging that releases the load.

389
00:22:50,673 --> 00:22:52,393
All three of those pathways breached.

390
00:22:53,433 --> 00:22:56,133
And on the right, the consequences with
their mitigative barriers,

391
00:22:56,493 --> 00:22:58,833
where the barricade and the rescue
arrangements held.

392
00:22:59,653 --> 00:23:03,733
The report says the defences clustered on
the consequence side while the preventive

393
00:23:03,793 --> 00:23:07,673
side, where a fatality of this kind has to
be stopped, was effectively open.

394
00:23:08,420 --> 00:23:12,520
Then the causal tree, which for me is the
most humane of the four.

395
00:23:13,300 --> 00:23:17,260
It takes each observed fact and asks why,
three times.

396
00:23:18,160 --> 00:23:22,420
Basket under the load: because there was
no verification step before approach,

397
00:23:22,880 --> 00:23:28,260
and the root is work control, with the no
load overhead rule not enforced by any

398
00:23:28,340 --> 00:23:30,100
hold point or independent check.

399
00:23:31,200 --> 00:23:35,880
Occupied basket driven from the ground:
routine practice contrary to the machine's

400
00:23:35,920 --> 00:23:40,660
design, with a root in equipment use
management that wasn't controlled to the

401
00:23:40,720 --> 00:23:42,080
manufacturer's instructions.

402
00:23:43,140 --> 00:23:47,640
Slings rigged as an unprotected wrap:
wrong hitch, no edge protection,

403
00:23:48,140 --> 00:23:50,660
root in competence and procedure for
slinging.

404
00:23:51,800 --> 00:23:56,980
Sling failed below its marked capacity:
nonconforming sling accepted into service,

405
00:23:57,400 --> 00:23:58,540
root in procurement.

406
00:23:59,500 --> 00:24:05,160
It's the TapRooT idea of moving past who
erred to why the system permitted the error

407
00:24:05,220 --> 00:24:06,040
to cause harm.

408
00:24:06,867 --> 00:24:09,647
And the fault tree is the one I'd want an
engineer to explain,

409
00:24:09,807 --> 00:24:10,467
but I'll try.

410
00:24:11,287 --> 00:24:14,007
It shows the death needed two branches to
be true together,

411
00:24:14,407 --> 00:24:15,307
an AND gate.

412
00:24:15,947 --> 00:24:20,587
Branch A, the load is released: the
unchoked wrap, the missing edge protection,

413
00:24:20,927 --> 00:24:25,327
the lost tension, the weak slings, the
second sling overloaded at the centre of

414
00:24:25,367 --> 00:24:25,807
gravity.

415
00:24:26,567 --> 00:24:30,587
Branch B, a worker in the line of fire:
the basket under the load,

416
00:24:31,207 --> 00:24:34,787
raised while the beam was still lowering,
driven from the ground controls,

417
00:24:35,147 --> 00:24:37,307
no hold point, no single command.

418
00:24:38,127 --> 00:24:40,727
Either branch alone would not have
produced this outcome.

419
00:24:41,330 --> 00:24:44,750
And then the cut sets, which is where the
whole analysis lands.

420
00:24:45,490 --> 00:24:50,610
A cut set is the smallest combination of
events that together cause the top event.

421
00:24:51,350 --> 00:24:55,370
The primary cut set is the one the
evidence supports as having happened.

422
00:24:56,030 --> 00:25:00,010
Basket under the load and raised into the
lowering beam from the ground controls,

423
00:25:00,510 --> 00:25:05,090
and basket contact reducing the sling
tension, so that the unchoked,

424
00:25:05,270 --> 00:25:08,750
unprotected sling slides, is cut, and
fails.

425
00:25:09,790 --> 00:25:15,330
A second, contributory cut set pairs a
worker under the load with a sling failing

426
00:25:15,390 --> 00:25:18,930
from compromised integrity or overload at
the centre of gravity.

427
00:25:19,912 --> 00:25:21,652
And here's the sentence I'd underline.

428
00:25:22,592 --> 00:25:27,291
Both cut sets share one common term:
worker under the load.

429
00:25:27,972 --> 00:25:31,712
Eliminate that single condition and you
defeat every cut set at once.

430
00:25:32,352 --> 00:25:35,272
That's why the report calls it the highest
leverage control,

431
00:25:35,632 --> 00:25:37,732
and why it says the four methods converge
on it.

432
00:25:38,698 --> 00:25:41,578
I want to push on one thing, though,
because I think listeners will.

433
00:25:42,218 --> 00:25:46,218
If the crew was experienced and competent,
the people on the ground knew you don't

434
00:25:46,318 --> 00:25:47,298
stand under a load.

435
00:25:47,838 --> 00:25:50,818
So how do you read this without saying
someone just got it wrong?

436
00:25:51,903 --> 00:25:55,023
The report's answer is that records alone
didn't prevent it.

437
00:25:55,463 --> 00:26:00,503
Everyone had assessed competence and
induction on file, and still the line of fire

438
00:26:00,523 --> 00:26:02,603
breach and the defective slinging
happened.

439
00:26:03,163 --> 00:26:07,243
Its conclusion is that the practical
standard applied on the day fell short,

440
00:26:07,623 --> 00:26:11,663
and that you need engineered hold points
and verified practical assessment,

441
00:26:12,063 --> 00:26:14,023
not reliance on individual judgement.

442
00:26:14,603 --> 00:26:19,003
And on accountability, it says individual
culpability is heavily mitigated,

443
00:26:19,343 --> 00:26:22,483
because the crew worked in a system that
didn't enforce the rule,

444
00:26:22,903 --> 00:26:27,963
allowed ground control operation of an
occupied platform, didn't sequence converging

445
00:26:28,023 --> 00:26:30,743
motions, and admitted nonconforming
slings.

446
00:26:31,322 --> 00:26:34,142
Though it does list the individuals' part
too.

447
00:26:34,762 --> 00:26:38,802
They carried out the lift with the basket
under the load and an incorrect hitch,

448
00:26:39,362 --> 00:26:41,842
enabled and directed by those layers
above.

449
00:26:42,622 --> 00:26:43,702
It says both things.

450
00:26:44,842 --> 00:26:45,682
I think that's right.

451
00:26:46,497 --> 00:26:49,237
It would be wrong to finish without the
things that worked,

452
00:26:49,537 --> 00:26:51,077
because the report insists on them.

453
00:26:51,737 --> 00:26:54,717
The hard barricading kept everybody else
out of the drop zone.

454
00:26:55,217 --> 00:27:00,637
A beam of 5.7 tonnes fell 17.5 metres, and
no one else was hurt.

455
00:27:01,277 --> 00:27:05,917
The rescue MEWP, positioned in advance to
one side, brought Fixer 1 down to the

456
00:27:05,977 --> 00:27:09,657
paramedic stretcher and then recovered
Fixer 2 from the steelwork.

457
00:27:10,277 --> 00:27:14,977
The medical response was prompt, from the
first responder at 11:50 to the clinic

458
00:27:15,037 --> 00:27:16,257
call at 11:51.

459
00:27:17,237 --> 00:27:19,937
The report recommends these be retained as
standards.

460
00:27:20,622 --> 00:27:24,622
And the report is equally firm that they
couldn't have changed the main outcome.

461
00:27:25,142 --> 00:27:29,862
The strengths limited the harm, it says,
but did not and could not prevent the fatal

462
00:27:29,922 --> 00:27:30,542
contact.

463
00:27:31,342 --> 00:27:35,022
On the injury side, it makes a point I
think is worth stating plainly.

464
00:27:35,682 --> 00:27:40,122
No personal protective equipment can
protect against a multi tonne load bearing onto

465
00:27:40,162 --> 00:27:41,342
an occupied platform.

466
00:27:42,022 --> 00:27:46,122
The decisive control is positional,
keeping people out from under the load,

467
00:27:46,362 --> 00:27:47,162
not protective.

468
00:27:47,862 --> 00:27:50,162
And it sets Fixer 2's escape next to that.

469
00:27:50,522 --> 00:27:53,122
He climbed clear in the seconds before the
final fall.

470
00:27:53,757 --> 00:27:57,597
Then there's the legal side, which the
report handles very carefully.

471
00:27:58,497 --> 00:28:03,157
Locally, the civil police investigation
found no charges and no criminal intent,

472
00:28:03,817 --> 00:28:07,157
and the labour office recorded an accident
with no party to blame.

473
00:28:08,217 --> 00:28:11,557
The independent investigators say they
don't determine liability.

474
00:28:12,337 --> 00:28:16,897
But they benchmarked the work against the
UK and EU framework as the duty holders'

475
00:28:17,097 --> 00:28:18,477
own internal standard.

476
00:28:19,377 --> 00:28:22,617
The Lifting Operations and Lifting
Equipment Regulations 1998,

477
00:28:22,857 --> 00:28:27,677
which say loads must not be suspended over
people unless unavoidable and controlled.

478
00:28:28,517 --> 00:28:30,417
PUWER 1998.

479
00:28:31,057 --> 00:28:33,217
The Work at Height Regulations 2005.

480
00:28:33,857 --> 00:28:40,357
BS 7121 for cranes, EN 280 for MEWPs, EN
1492 part 1 for

481
00:28:40,437 --> 00:28:44,457
textile slings, and the Machinery
Directive for the conformity regime.

482
00:28:45,357 --> 00:28:50,117
The summary assessment is five principal
departures, each independently significant.

483
00:28:51,168 --> 00:28:55,208
I'd like to be careful here, too, about
what the report does and doesn't say about

484
00:28:55,308 --> 00:28:55,988
hindsight.

485
00:28:56,648 --> 00:29:01,728
It says this fatality was not the product
of misfortune or of a single error.

486
00:29:02,408 --> 00:29:06,808
And its closing statement is that a single
working control at any layer would most

487
00:29:06,848 --> 00:29:08,028
likely have prevented it.

488
00:29:08,788 --> 00:29:13,208
An enforced no load overhead hold point,
basket control operation,

489
00:29:13,708 --> 00:29:17,968
a sequenced lift under single command, a
correct edge protected hitch,

490
00:29:18,508 --> 00:29:19,708
or conforming slings.

491
00:29:20,308 --> 00:29:20,888
Any one.

492
00:29:21,497 --> 00:29:22,797
That's the thing that gets me.

493
00:29:23,537 --> 00:29:28,217
Five separate places where the story could
have stopped, and the report's phrase for

494
00:29:28,257 --> 00:29:33,517
the day is that no future lift should be
allowed to proceed with these defences

495
00:29:33,617 --> 00:29:34,977
simultaneously down.

496
00:29:35,677 --> 00:29:36,437
Simultaneously.

497
00:29:37,317 --> 00:29:39,257
That's the whole case in one word.

498
00:29:40,228 --> 00:29:43,068
So what happened afterwards, concretely?

499
00:29:44,048 --> 00:29:49,248
On the day, the GT31 area was closed to
everyone except the investigators,

500
00:29:49,428 --> 00:29:50,588
and site work stopped.

501
00:29:51,468 --> 00:29:55,688
The police and labour office were
informed, and the dead man's family was contacted.

502
00:29:56,888 --> 00:29:59,028
All lifting with nylon slings was stopped.

503
00:29:59,688 --> 00:30:02,508
The incident batch was quarantined and
sent for government testing,

504
00:30:03,348 --> 00:30:05,328
and the information was shared with other
sites.

505
00:30:06,328 --> 00:30:10,348
The tower crane was withdrawn pending
inspection, and all rigging equipment,

506
00:30:10,568 --> 00:30:14,348
including subcontractors' slings and
chains, was checked for certification.

507
00:30:15,348 --> 00:30:18,808
A third party rigging trainer was brought
to site, and the riggers were to be

508
00:30:18,868 --> 00:30:22,028
reassessed in theory and practice before
returning to work.

509
00:30:22,695 --> 00:30:27,515
And the corrective actions are ranked,
with elimination of the line of fire at the

510
00:30:27,595 --> 00:30:27,855
top.

511
00:30:28,515 --> 00:30:34,295
A rule prohibiting any person or any MEWP
basket beneath a suspended load,

512
00:30:34,735 --> 00:30:38,715
with a mandatory hold point that needs
positive confirmation that nobody's

513
00:30:38,775 --> 00:30:41,575
underneath before the load is moved or
approached.

514
00:30:42,675 --> 00:30:46,975
Ground controls restricted to emergency
recovery, testing and maintenance.

515
00:30:47,775 --> 00:30:53,095
No simultaneous crane lowering and basket
raising, with a single appointed person

516
00:30:53,155 --> 00:30:56,015
holding sole authority to command and to
stop.

517
00:30:57,115 --> 00:31:01,915
A secured hitch and purpose made edge
protection for long or asymmetric members.

518
00:31:02,795 --> 00:31:05,855
An independent spotter with explicit stop
authority.

519
00:31:06,695 --> 00:31:12,295
And slings that carry CE or UKCA marking
and a valid Declaration of Conformity,

520
00:31:12,735 --> 00:31:15,475
with A5 flyers rejected at goods inwards.

521
00:31:16,072 --> 00:31:20,752
And the last concrete thing in the
document is the condition for going back to work.

522
00:31:21,812 --> 00:31:27,192
Lifting operations may resume only when
all of the top priority actions are verified

523
00:31:27,252 --> 00:31:27,712
complete.

524
00:31:28,632 --> 00:31:32,652
A revised lift plan with the hold point,
basket control operation,

525
00:31:33,132 --> 00:31:38,012
sequencing, edge protected slinging, a
spotter and a communication protocol.

526
00:31:39,012 --> 00:31:43,912
Every sling re-verified for valid marking
and a compliant Declaration of Conformity,

527
00:31:44,552 --> 00:31:48,872
with the incident batch and any sling
lacking valid documentation removed from

528
00:31:48,972 --> 00:31:49,412
service.

529
00:31:50,432 --> 00:31:55,912
Operators, riggers and slingers reassessed
in theory and practice and signed off by

530
00:31:55,952 --> 00:31:57,252
the third party trainer.

531
00:31:58,132 --> 00:32:00,712
The tower crane inspection completed and
cleared.

532
00:32:01,512 --> 00:32:05,592
And the whole workforce briefed on the new
method, on the line of fire rule,

533
00:32:06,172 --> 00:32:10,392
and on the basket control rule, before a
single beam goes back in the air.