Hello, and welcome to ISAMS Explained.

2
00:00:03,040 --> 00:00:05,440
This is the Level 1 episode: the big
picture.

3
00:00:06,160 --> 00:00:08,520
If you're new to ISAMS, this is the place
to start.

4
00:00:09,100 --> 00:00:13,600
In about fifteen minutes we'll cover what
ISAMS is, how a drawing moves through it

5
00:00:13,640 --> 00:00:17,180
from the day it arrives to the day it's
handed over, and where your part of the

6
00:00:17,220 --> 00:00:18,020
business fits in.

7
00:00:18,640 --> 00:00:22,320
As with all our episodes, this is a
scripted walkthrough of how the system is

8
00:00:22,420 --> 00:00:25,060
actually built, and the voices are
computer-generated.

9
00:00:25,800 --> 00:00:27,420
I'm joined by our Systems Director.

10
00:00:27,760 --> 00:00:28,080
Welcome.

11
00:00:28,822 --> 00:00:29,262
Thanks.

12
00:00:29,602 --> 00:00:31,902
And a quick word on how the series works.

13
00:00:32,422 --> 00:00:35,762
The hope is that this episode will provide
the listener with an overall

14
00:00:35,822 --> 00:00:38,002
understanding of the ISAMS system.

15
00:00:38,662 --> 00:00:42,602
Don't worry if there are any particular
details that you do not follow fully on

16
00:00:42,682 --> 00:00:43,382
first pass.

17
00:00:43,982 --> 00:00:48,802
There will also be a Level 2 overall
podcast to follow on from this one that will

18
00:00:48,862 --> 00:00:52,102
delve a little deeper into the overall
ISAMS picture.

19
00:00:54,092 --> 00:00:59,132
the systems department will also be
producing narrated videos with supporting screen

20
00:00:59,172 --> 00:00:59,512
shots.

21
00:01:00,212 --> 00:01:05,212
These will be more detailed 6 to 10 minute
videos and each will be focussed on a

22
00:01:05,312 --> 00:01:07,072
specific topic or function.

23
00:01:08,032 --> 00:01:12,532
Personnel can pick which of these videos
are pertinent to their tasks and ensure

24
00:01:12,572 --> 00:01:16,272
that they are getting full systems support
to complete these Let's tasks.

25
00:01:15,893 --> 00:01:16,773
start with the name.

26
00:01:17,133 --> 00:01:18,953
What does ISAMS stand for?

27
00:01:19,733 --> 00:01:22,553
Isometric Administration and Management
System.

28
00:01:23,653 --> 00:01:29,153
An isometric, or iso for short, is the
drawing a piping engineer produces for a run

29
00:01:29,193 --> 00:01:29,693
of pipe.

30
00:01:30,473 --> 00:01:36,493
It shows every pipe length, elbow, flange,
valve, gasket and bolt set on that run.

31
00:01:37,413 --> 00:01:42,173
In piping work the iso is the go to
fundamental point of reference for all.

32
00:01:42,913 --> 00:01:49,193
Everything we buy, store, fabricate, weld,
install and get paid for traces back to

33
00:01:49,233 --> 00:01:49,773
an iso.

34
00:01:49,893 --> 00:01:52,873
ISAMS is built around that idea.

35
00:01:53,613 --> 00:01:54,533
And it's our own system?

36
00:01:55,110 --> 00:01:55,550
It is.

37
00:01:56,150 --> 00:02:00,390
It was conceived, designed and developed
in-house at MSL.

38
00:02:01,090 --> 00:02:05,530
It is a totally bespoke system customised
to MSL's own needs.

39
00:02:06,150 --> 00:02:11,010
It is made using a relational database
platform owned by Apple computers called

40
00:02:11,090 --> 00:02:12,130
Filemaker Pro.

41
00:02:12,930 --> 00:02:16,190
it is a cloud based system running on our
own cloud server.

42
00:02:16,862 --> 00:02:22,002
You open ISAMS via the FileMaker Pro app
installed on your PC or Mac.

43
00:02:22,842 --> 00:02:27,022
Everyone is working on the same live data
as everyone else in the company.

44
00:02:27,702 --> 00:02:32,722
Drawings, product alignment, procurement,
goods received, material used,

45
00:02:33,002 --> 00:02:37,922
intelligent stock control, smart tools for
production and client reporting and

46
00:02:37,982 --> 00:02:38,562
invoicing.

47
00:02:39,122 --> 00:02:42,522
All in one place, shaped around how we
actually work.

48
00:02:43,090 --> 00:02:44,290
How big is it, roughly?

49
00:02:44,925 --> 00:02:47,585
Big enough that it pays to understand the
structure.

50
00:02:48,245 --> 00:02:52,925
There are over forty thousand isometric
drawings in it, over half a million

51
00:02:52,985 --> 00:02:58,105
component lines on those isometrics,
around 50 thousand products in the catalogue,

52
00:02:58,585 --> 00:03:00,585
and several thousand purchase orders.

53
00:03:01,425 --> 00:03:03,165
That's why the structure matters.

54
00:03:03,705 --> 00:03:05,685
You don't scroll through ISAMS.

55
00:03:06,185 --> 00:03:07,545
You find what you need.

56
00:03:08,152 --> 00:03:10,252
And does everyone see everything?

57
00:03:10,962 --> 00:03:11,202
No.

58
00:03:11,622 --> 00:03:13,042
Access is by role.

59
00:03:13,742 --> 00:03:17,442
When you log in, your account has a
privilege set: engineering,

60
00:03:17,822 --> 00:03:22,702
engineering super user, commercials, goods
in, read-only, and so on.

61
00:03:23,482 --> 00:03:26,962
That decides which screens you can open,
which fields you can change,

62
00:03:27,302 --> 00:03:28,482
and whether you see prices.

63
00:03:29,142 --> 00:03:32,982
So if a button you've heard about isn't on
your screen, it's usually because your

64
00:03:33,042 --> 00:03:35,642
role doesn't need it, not because
something's broken.

65
00:03:36,258 --> 00:03:38,178
What are the main things I need to know
about?

66
00:03:38,942 --> 00:03:40,202
Five building blocks.

67
00:03:40,722 --> 00:03:45,702
Projects, isometrics, isometric
components, the product catalogue,

68
00:03:46,122 --> 00:03:47,142
and purchase orders.

69
00:03:47,802 --> 00:03:50,022
Get those five and the rest makes sense.

70
00:03:50,417 --> 00:03:52,057
Projects first.

71
00:03:52,463 --> 00:03:57,703
Every piece of work belongs to a project,
and each project has a short job code.

72
00:03:58,283 --> 00:04:04,983
You'll hear codes like IN06, NN01, ES01 or
SG01.

73
00:04:05,983 --> 00:04:10,803
The project holds the client, the site,
the format the client's files come in,

74
00:04:11,283 --> 00:04:13,563
and the project's own product catalogue.

75
00:04:14,343 --> 00:04:19,163
When you see a list of isometrics or
products, it's almost always filtered to one

76
00:04:19,263 --> 00:04:19,703
project.

77
00:04:20,362 --> 00:04:21,942
Then the iso itself.

78
00:04:22,588 --> 00:04:25,688
The isometric record is the heart of
ISAMS.

79
00:04:26,508 --> 00:04:28,648
One record per drawing, per revision.

80
00:04:29,408 --> 00:04:32,708
It holds the isometric number, which is
the client's drawing number,

81
00:04:33,248 --> 00:04:37,088
the MSL reference, the revision, the pipe
spec, the service,

82
00:04:37,388 --> 00:04:41,428
the location and module, the workpack, the
attached PDF drawings,

83
00:04:41,588 --> 00:04:42,368
and its stage.

84
00:04:43,288 --> 00:04:46,668
The isometric form has tabs along the top
for summary details,

85
00:04:46,968 --> 00:04:51,268
components, engineering, welds, flange
boxes, the spool log,

86
00:04:51,548 --> 00:04:52,748
attachments and more.

87
00:04:53,508 --> 00:04:56,328
Most people spend most of their day on
that one form.

88
00:04:57,045 --> 00:04:58,265
You said per revision.

89
00:04:58,685 --> 00:05:00,385
What happens when a drawing is revised?

90
00:05:01,007 --> 00:05:06,067
A new revision comes in as its own record,
and the old one becomes superseded.

91
00:05:07,287 --> 00:05:12,707
Every isometric has a status: live,
superseded, cancelled, or on hold.

92
00:05:13,467 --> 00:05:16,767
And this is one of the most important
ideas in the whole system.

93
00:05:17,507 --> 00:05:19,567
Only live isometrics count.

94
00:05:20,347 --> 00:05:23,027
The live drawings are the ones issued to
the shop floor.

95
00:05:23,627 --> 00:05:28,587
Material demand, reports and readiness all
work off live isometrics.

96
00:05:29,367 --> 00:05:34,227
A superseded drawing stays in ISAMS for
history, but other than recording this

97
00:05:34,267 --> 00:05:38,907
history and potentially some commercial
implications, it doesn't drive anything.

98
00:05:39,590 --> 00:05:41,010
Next, the components.

99
00:05:41,590 --> 00:05:45,850
Each isometric has a list of components,
the lines on the drawing.

100
00:05:46,450 --> 00:05:50,310
The MTO, the BOM, we have different
acronyms for it.

101
00:05:51,190 --> 00:05:56,690
These MTOs are extracted from the drawing
using our bespoke AI technology and

102
00:05:56,730 --> 00:06:00,290
converted to a certain format of an excel
file for uploading.

103
00:06:00,970 --> 00:06:04,750
Each line has to be aligned to a product
code and has a quantity,

104
00:06:05,090 --> 00:06:10,030
a size, a spec and a category, like pipe,
fittings, flanges,

105
00:06:10,450 --> 00:06:12,350
valves, gaskets or bolts.

106
00:06:13,130 --> 00:06:14,590
Pipe is measured in metres.

107
00:06:14,990 --> 00:06:16,230
Everything else is a count.

108
00:06:16,910 --> 00:06:20,770
Those lines come in from the client's
drawings through an automated process.

109
00:06:21,350 --> 00:06:24,750
This allows us to process large numbers of
drawings very quickly,

110
00:06:25,230 --> 00:06:27,150
nobody types anything in by hand.

111
00:06:27,717 --> 00:06:30,177
And the product code links to the
catalogue.

112
00:06:30,860 --> 00:06:31,320
Exactly.

113
00:06:32,060 --> 00:06:35,620
The product catalogue is the list of
everything we buy for a project.

114
00:06:36,080 --> 00:06:42,180
Each product has its description, size,
spec, supplier, price and a product class.

115
00:06:42,720 --> 00:06:43,920
The class matters.

116
00:06:44,640 --> 00:06:46,780
Fabrication products go to the spool shop.

117
00:06:47,200 --> 00:06:49,380
Assembly products go out for site
assembly.

118
00:06:50,140 --> 00:06:54,620
SPS products are secondary pipe supports,
which have their own simpler route.

119
00:06:55,200 --> 00:06:57,900
And Other covers anything that's none of
those.

120
00:06:58,800 --> 00:07:03,540
The catalogue form also shows, for each
product, how much is on live isometrics,

121
00:07:03,880 --> 00:07:08,180
how much is ordered, delivered, in stock,
reserved and available.

122
00:07:08,800 --> 00:07:10,960
And the fifth block, purchase orders.

123
00:07:11,733 --> 00:07:17,533
A purchase order in ISAMS is the order to
a supplier, with a line for each product

124
00:07:17,613 --> 00:07:18,373
and quantity.

125
00:07:19,333 --> 00:07:24,173
Each row of the purchase order contains
the full technical details of item including

126
00:07:24,213 --> 00:07:25,513
its spec and size.

127
00:07:26,393 --> 00:07:31,333
It also cites the SAP purchase order
number once the order has gone through SAP,

128
00:07:31,693 --> 00:07:35,653
because SAP is our finance system and the
only route for payment.

129
00:07:35,653 --> 00:07:42,073
ISAMS also uses the engine of the purchase
orders to generate and issue requests for

130
00:07:42,113 --> 00:07:43,513
quotations to suppliers.

131
00:07:44,213 --> 00:07:49,033
The complete technical descriptions of all
items ensure that the quotations received

132
00:07:49,113 --> 00:07:50,553
are accurate snd valid.

133
00:07:51,130 --> 00:07:54,390
So how does a drawing actually travel
through ISAMS?

134
00:07:54,947 --> 00:07:55,927
Through stages.

135
00:07:56,707 --> 00:08:00,727
Every isometric sits at a stage, and there
are nineteen of them.

136
00:08:01,587 --> 00:08:05,327
You see them as a coloured strip across
the top of the isometric form,

137
00:08:05,787 --> 00:08:07,727
and the current stage is highlighted.

138
00:08:08,587 --> 00:08:12,607
You don't need to memorise them today, but
it helps to hear the shape of the

139
00:08:12,687 --> 00:08:13,067
journey.

140
00:08:13,877 --> 00:08:14,277
Go on, then.

141
00:08:14,987 --> 00:08:18,167
The first three are about getting the
drawing in and bought.

142
00:08:19,027 --> 00:08:23,607
Stage one, Issued to Systems: the drawing
has arrived and been loaded.

143
00:08:24,527 --> 00:08:26,667
Stage two, Issued to Procurement.

144
00:08:27,347 --> 00:08:32,267
Stage three, Processed by Procurement:
procurement have checked it and the material

145
00:08:32,347 --> 00:08:33,887
is ordered or in hand.

146
00:08:34,208 --> 00:08:36,008
Then fabrication.

147
00:08:36,482 --> 00:08:39,622
Stages four to nine are the fabrication
track.

148
00:08:40,402 --> 00:08:45,842
Four and five are about stock: partially
reserved, waiting on fabrication items,

149
00:08:46,302 --> 00:08:49,022
and then fully reserved, ready for IFF.

150
00:08:49,862 --> 00:08:53,982
IFF means Issued for Fabrication, and
that's stage six.

151
00:08:55,182 --> 00:09:00,082
Seven is Issued for Fabrication Picking,
when stores are picking the material.

152
00:09:01,142 --> 00:09:03,602
Eight is Fabrication Picking Complete.

153
00:09:04,402 --> 00:09:08,161
Nine is Fabrication Complete: the spools
are made.

154
00:09:08,618 --> 00:09:10,738
And assembly runs alongside?

155
00:09:11,300 --> 00:09:13,540
Alongside, yes, on its own track.

156
00:09:14,080 --> 00:09:18,260
Stages ten to fifteen mirror fabrication
for the assembly material.

157
00:09:18,960 --> 00:09:23,600
Partially reserved, fully reserved and
ready for IFA, which is Issued for Assembly,

158
00:09:24,260 --> 00:09:29,180
then assembly picking, picking complete,
and Assembly Complete at fifteen.

159
00:09:30,280 --> 00:09:34,820
An isometric has two pointers, one for the
main track and one for the assembly

160
00:09:34,860 --> 00:09:39,440
track, and the assembly track can start as
soon as procurement have processed the

161
00:09:39,480 --> 00:09:39,800
drawing.

162
00:09:40,465 --> 00:09:41,905
And the end of the road?

163
00:09:42,750 --> 00:09:46,650
The two tracks meet when an isometric
reaches stage 16.

164
00:09:47,090 --> 00:09:51,970
From this point and onwards, ISAMS is just
a basic reflection of the status that the

165
00:09:52,050 --> 00:09:53,950
isometric achieves on EIDA.

166
00:09:54,910 --> 00:09:57,490
Stage 16 is when Testing is Complete.

167
00:09:58,070 --> 00:10:01,410
This requires that both fabrication and
assembly are finished.

168
00:10:02,290 --> 00:10:04,790
Then seventeen, Reinstated Fully.

169
00:10:05,690 --> 00:10:10,430
Eighteen is Painting or Insulation
Complete And finally nineteen,

170
00:10:10,850 --> 00:10:11,990
Handover Complete.

171
00:10:12,710 --> 00:10:17,250
That's the drawing's whole life, from the
paper of the isometric to handed-over

172
00:10:17,370 --> 00:10:20,130
pipe, tested and installed on site.

173
00:10:20,617 --> 00:10:23,637
Who moves an isometric from one stage to
the next?

174
00:10:24,403 --> 00:10:25,623
It depends on the stage.

175
00:10:26,263 --> 00:10:30,863
Some moves are made by people, on the
stage drop-down or by clicking the strip,

176
00:10:31,363 --> 00:10:34,123
and ISAMS checks the move is allowed
first.

177
00:10:34,663 --> 00:10:36,683
If it isn't, it tells you what's missing.

178
00:10:37,783 --> 00:10:43,083
Other moves are made by the system as a
result of real work: reserving stock moves

179
00:10:43,123 --> 00:10:47,883
an isometric to four or five, issuing a
pick list moves it to seven,

180
00:10:48,443 --> 00:10:50,523
completing the pick list moves it to
eight.

181
00:10:51,303 --> 00:10:52,163
That's deliberate.

182
00:10:52,583 --> 00:10:55,583
The stage should always tell the truth
about the drawing.

183
00:10:56,097 --> 00:10:58,617
You mentioned secondary pipe supports
earlier.

184
00:10:58,897 --> 00:11:00,157
Do they follow the same journey?

185
00:11:00,840 --> 00:11:02,140
No, they have a shorter one.

186
00:11:02,920 --> 00:11:07,740
Secondary pipe support drawings, SPS
drawings for short, are loaded into the

187
00:11:07,820 --> 00:11:11,240
isometric section so their material can be
ordered and tracked,

188
00:11:11,620 --> 00:11:15,240
but they have their own short stream:
issued for fabrication,

189
00:11:15,800 --> 00:11:19,240
picking, picking complete, fabrication
complete.

190
00:11:20,280 --> 00:11:23,900
On the isometric form they get their own,
shorter stage strip,

191
00:11:24,260 --> 00:11:27,020
so you can tell them apart from isometrics
at a glance.

192
00:11:27,718 --> 00:11:28,818
Let's follow the material.

193
00:11:29,498 --> 00:11:30,878
Where does buying start?

194
00:11:31,570 --> 00:11:32,490
With the import.

195
00:11:32,810 --> 00:11:38,270
The client sends drawings, a transmittal
of PDF documents to our doc control.

196
00:11:39,130 --> 00:11:43,930
As mentioned earlier, we run these
drawings through our bespoke AI system and

197
00:11:44,010 --> 00:11:46,810
generate a specific Excel file for each
one.

198
00:11:47,670 --> 00:11:52,950
This contains the material list per
drawing, it detects opes on the drawings and can

199
00:11:53,010 --> 00:11:55,710
read the valve or instrument tags on the
drawings.

200
00:11:56,423 --> 00:12:01,843
Systems load those into ISAMS, and the
import reads each material list into

201
00:12:01,903 --> 00:12:07,223
component lines and matches each one to a
product code in that project's catalogue.

202
00:12:08,103 --> 00:12:11,203
Some products automatically bring
companion items with them.

203
00:12:11,783 --> 00:12:16,643
A pipe shoe, for example, can add its pad,
U-bolt, nuts and washers,

204
00:12:17,083 --> 00:12:21,163
because the client's list doesn't include
them but we still have to buy them.

205
00:12:21,840 --> 00:12:25,220
So once the lines are in, how does
procurement know what to buy?

206
00:12:25,800 --> 00:12:29,000
The main tool is the Summary of isometric
Components.

207
00:12:29,620 --> 00:12:34,380
You find the isometrics you're interested
in, open Smart Tools on the isometric

208
00:12:34,440 --> 00:12:36,060
form, and run that report.

209
00:12:36,740 --> 00:12:41,000
It gives one row per product: how much is
needed on live isometrics,

210
00:12:41,440 --> 00:12:46,160
how much is on order, how much has been
delivered, and the shortfall still to order.

211
00:12:46,900 --> 00:12:49,900
That shortfall is what turns into purchase
orders.

212
00:12:50,548 --> 00:12:52,628
And what counts as ordered?

213
00:12:53,158 --> 00:12:59,118
A purchase order counts as ordered once it
has been issued with a SAP number or is a

214
00:12:59,198 --> 00:13:01,218
free issue PO from a client.

215
00:13:02,098 --> 00:13:07,238
Some purchase orders can be flagged as RFQ
only - requests for quotation.

216
00:13:07,878 --> 00:13:12,278
This is where we take advantage of our
automated system that has populated up the

217
00:13:12,338 --> 00:13:17,078
purchase orders with all the necessary
details and we pass these on to suppliers to

218
00:13:17,118 --> 00:13:17,818
get our quotes.

219
00:13:18,243 --> 00:13:19,643
Then chasing the supplier.

220
00:13:20,340 --> 00:13:21,500
That's expediting.

221
00:13:22,060 --> 00:13:27,180
Each purchase order has expected delivery
dates, either for the whole order or line

222
00:13:27,220 --> 00:13:31,320
by line, and an expediting log of every
contact with the supplier.

223
00:13:32,240 --> 00:13:36,640
The Expediting Centre pulls together
everything that needs chasing and everything

224
00:13:36,660 --> 00:13:37,160
that's late.

225
00:13:37,700 --> 00:13:39,300
There's a short episode just on that.

226
00:13:39,902 --> 00:13:41,402
And when the delivery arrives?

227
00:13:42,378 --> 00:13:47,598
Goods in books it against the purchase
order as a GRN, a goods received note,

228
00:13:47,958 --> 00:13:50,678
line by line, with the delivery docket
number.

229
00:13:51,718 --> 00:13:56,058
The docket PDF and the material
certificates are saved against the order,

230
00:13:56,558 --> 00:13:58,058
so anyone can open them later.

231
00:13:59,138 --> 00:14:02,458
From that moment the material is in stock
in ISAMS.

232
00:14:03,175 --> 00:14:05,275
How does ISAMS keep track of stock?

233
00:14:05,923 --> 00:14:06,543
As a ledger.

234
00:14:07,323 --> 00:14:11,723
Every movement is a line: received,
reserved for fabrication,

235
00:14:12,223 --> 00:14:16,723
reserved for assembly, transferred between
product codes, written off,

236
00:14:17,083 --> 00:14:17,623
and so on.

237
00:14:18,423 --> 00:14:20,043
Nothing just changes a number.

238
00:14:20,463 --> 00:14:25,023
So you can always see why the stock is
what it is, on the Stock History tab of the

239
00:14:25,063 --> 00:14:25,423
product.

240
00:14:26,543 --> 00:14:31,263
The headline figure people care about is
available: what's in stock that isn't

241
00:14:31,363 --> 00:14:33,443
already promised to another isometric.

242
00:14:33,750 --> 00:14:35,750
Promised how?

243
00:14:35,990 --> 00:14:36,970
By reservation.

244
00:14:37,490 --> 00:14:39,950
This is a big idea, so it's worth a
minute.

245
00:14:40,770 --> 00:14:46,810
Before an isometric is issued for
fabrication, ISAMS reserves the exact material it

246
00:14:46,870 --> 00:14:49,870
needs, item by item, in priority order.

247
00:14:50,690 --> 00:14:54,810
Once it's reserved for one isometric, it's
no longer available to the next.

248
00:14:55,550 --> 00:15:00,310
Without that, ten drawings could all look
ready while sharing the same ten elbows.

249
00:15:00,908 --> 00:15:07,100
Where does that happen On IFF Preparation
for fabrication and IFA Preparation for

250
00:15:07,160 --> 00:15:09,560
assembly, both in Smart Tools.

251
00:15:10,300 --> 00:15:13,820
The readiness report shows each isometric
with a coloured chip.

252
00:15:14,500 --> 00:15:16,200
Green means everything's available.

253
00:15:16,780 --> 00:15:19,580
Orange means something's on order but not
yet here.

254
00:15:20,220 --> 00:15:22,520
Red means something isn't ordered at all.

255
00:15:23,480 --> 00:15:28,640
From there you allocate stock, and fully
covered isometrics are reserved and move to

256
00:15:28,680 --> 00:15:30,420
the queue, ready to be issued.

257
00:15:31,090 --> 00:15:34,630
And if an isometric is nearly ready but
one item's missing?

258
00:15:35,297 --> 00:15:37,417
Then it can be issued with exceptions.

259
00:15:38,017 --> 00:15:42,997
The available lines are reserved, and each
missing line becomes an exception: a

260
00:15:43,057 --> 00:15:46,117
quantity the stores still owe that
isometric.

261
00:15:46,997 --> 00:15:51,497
Exceptions sit on the Exception Queue
until stock arrives and they're filled.

262
00:15:52,177 --> 00:15:54,317
Nothing is quietly forgotten.

263
00:15:54,883 --> 00:15:56,343
So the isometrics issued.

264
00:15:56,823 --> 00:15:58,503
What happens on the shop floor side?

265
00:15:59,213 --> 00:16:00,553
Stores get a pick list.

266
00:16:01,193 --> 00:16:07,073
Issuing from the IFF or IFA queue creates
a draft pick list that pools the reserved

267
00:16:07,113 --> 00:16:08,693
material by product code.

268
00:16:09,513 --> 00:16:14,613
Once it's issued for picking, stores pick
it, confirm each line as full or short,

269
00:16:15,033 --> 00:16:15,793
and complete it.

270
00:16:16,633 --> 00:16:21,153
That's what moves the isometric from seven
to eight, or thirteen to fourteen,

271
00:16:21,633 --> 00:16:23,453
and books the material as used.

272
00:16:23,833 --> 00:16:24,753
And welding?

273
00:16:25,152 --> 00:16:30,232
Engineering assigns the welds on each
isometric, one line per weld.

274
00:16:31,092 --> 00:16:34,352
This gives us a base to help populate up
the weld log.

275
00:16:35,292 --> 00:16:40,332
It also gives us the weld count per size
which allows us to calculate the weld

276
00:16:40,412 --> 00:16:45,832
inches on each isometric and it allows the
commercial department to know how much to

277
00:16:45,892 --> 00:16:48,712
charge the client for the welding on the
isometric.

278
00:16:49,300 --> 00:16:50,400
What about spools?

279
00:16:51,112 --> 00:16:55,572
The spool log on the isometric records
each spool made from the drawing.

280
00:16:56,392 --> 00:16:59,972
If a spool has a problem, it can be put in
quarantine with a reason,

281
00:17:00,372 --> 00:17:04,272
and the Quarantine Register lists every
quarantined spool by project,

282
00:17:04,712 --> 00:17:07,372
so nothing defective goes out to site by
mistake.

283
00:17:08,025 --> 00:17:11,245
You mentioned the commercial department
and charging the client.

284
00:17:11,665 --> 00:17:13,105
Can you expand on this somewhat?

285
00:17:13,902 --> 00:17:14,682
Yes, of course.

286
00:17:15,202 --> 00:17:19,762
A very large part of ISAMS is generating
what the commercial department calls the

287
00:17:19,842 --> 00:17:20,242
measure.

288
00:17:20,922 --> 00:17:25,042
This is basically where we charge the
client for every isometric that we fabricate

289
00:17:25,082 --> 00:17:25,802
and install.

290
00:17:26,622 --> 00:17:30,582
To charge the client correctly not only do
we have to have an entire list of every

291
00:17:30,642 --> 00:17:35,222
single component that was used, but we
also have to charge for welds and flange

292
00:17:35,262 --> 00:17:37,522
boxes, insulation, cladding, etc.

293
00:17:38,582 --> 00:17:42,442
The commercial aspect of ISAMS is only
available to people working in the commercial

294
00:17:42,482 --> 00:17:45,882
department but our ability to very quickly
populate the measure,

295
00:17:46,142 --> 00:17:50,022
and have that as a running tally
throughout the lifecycle of the project is a great

296
00:17:50,082 --> 00:17:51,982
benefit and value to MSL.

297
00:17:52,762 --> 00:17:57,282
Some of the measures for projects can be
100 thousand rows of information so that

298
00:17:57,402 --> 00:17:59,462
scale alone can provide us with
challenges.

299
00:18:00,010 --> 00:18:03,990
The material we are tracking so carefully,
what about getting it to site?

300
00:18:04,633 --> 00:18:09,713
Material for site goes out on an MTR, a
Material Transfer Request,

301
00:18:10,133 --> 00:18:14,693
which lists what's going where and for
which workpack, with its own status steps.

302
00:18:15,693 --> 00:18:20,333
Workpacks themselves are how the site
groups isometrics into packages of work,

303
00:18:20,773 --> 00:18:25,533
and there are reports available on ISAMS
that show the status of all isometrics

304
00:18:25,573 --> 00:18:29,973
within any pack and the status of all the
material on these isometrics.

305
00:18:30,493 --> 00:18:31,713
That's a lot of screens.

306
00:18:32,413 --> 00:18:33,373
How do I find my way?

307
00:18:34,130 --> 00:18:34,850
Three things.

308
00:18:35,470 --> 00:18:37,010
First, the Main Dashboard.

309
00:18:37,550 --> 00:18:41,750
It's the home page, with buttons for
isometrics, the product catalogue,

310
00:18:42,130 --> 00:18:46,170
purchase orders, suppliers, goods
received, delivery dockets,

311
00:18:46,570 --> 00:18:49,829
MTRs, workpacks, modules and projects.

312
00:18:50,990 --> 00:18:56,210
Second, the isometric form and its tabs,
where most of the day-to-day work happens.

313
00:18:57,230 --> 00:19:00,510
Third, the Smart Tools button on the
isometric form.

314
00:19:01,090 --> 00:19:06,670
It opens a menu with two halves:
Production, for IFF and IFA preparation,

315
00:19:07,050 --> 00:19:10,730
the queues, pick lists and exceptions, and
Reports.

316
00:19:11,282 --> 00:19:12,322
What reports are there?

317
00:19:13,007 --> 00:19:17,207
The Summary of isometric Components, the
Full Isometric Report,

318
00:19:17,747 --> 00:19:21,727
the Measure reports, the weld reports and
the Quarantine Register.

319
00:19:22,567 --> 00:19:26,667
They're built on the server, so they're
quick even over a slow connection,

320
00:19:27,307 --> 00:19:31,687
and most have an Excel button that exports
exactly what you see on screen.

321
00:19:32,298 --> 00:19:34,918
You keep saying find the isometrics first.

322
00:19:35,592 --> 00:19:39,032
Because it's the single most important
habit in ISAMS.

323
00:19:39,792 --> 00:19:45,352
Almost every report and tool works on your
found set: the records you've currently

324
00:19:45,452 --> 00:19:46,392
found on screen.

325
00:19:47,152 --> 00:19:51,312
Find the project, or the workpack, or the
isometrics you care about,

326
00:19:51,812 --> 00:19:53,012
then run the tool.

327
00:19:53,912 --> 00:19:59,072
If a report looks wrong, the first
question is always: what was my found set?

328
00:19:59,655 --> 00:20:02,835
Before we finish, what are the golden
rules for a new user?

329
00:20:03,567 --> 00:20:05,847
Five Rules that I would recommend for the
beginner.

330
00:20:06,627 --> 00:20:06,807
number.

331
00:20:06,907 --> 00:20:10,527
One: everything hangs off the isometric
and the product code.

332
00:20:11,047 --> 00:20:12,927
Get those right and the rest follows.

333
00:20:13,947 --> 00:20:19,147
number Two: only live isometrics count, so
check the status before you trust a

334
00:20:19,187 --> 00:20:19,507
number.

335
00:20:20,447 --> 00:20:22,847
number Three: use the proper route.

336
00:20:23,487 --> 00:20:27,507
Move stages with the stage controls,
reserve with the preparation screens,

337
00:20:27,987 --> 00:20:29,107
pick with pick lists.

338
00:20:29,687 --> 00:20:33,247
Don't try to type over a stage or a
quantity to make a screen look right.

339
00:20:34,187 --> 00:20:36,727
number four mind your found set.

340
00:20:37,427 --> 00:20:40,987
and finally number five, if something
looks wrong, say so.

341
00:20:41,707 --> 00:20:46,207
The system is developed in-house, changes
are backed up and tested offline before

342
00:20:46,247 --> 00:20:49,307
they go live, and problems you report get
fixed.

343
00:20:49,985 --> 00:20:51,045
And what's next?

344
00:20:51,715 --> 00:20:58,455
Level two which goes a step deeper: how
revisions work, what each stage gate checks,

345
00:20:59,035 --> 00:21:04,115
how the stock figures are worked out, how
reservation and exceptions really behave,

346
00:21:04,735 --> 00:21:08,575
companion items, workpacks, and who's
allowed to do what.

347
00:21:09,037 --> 00:21:10,057
Thanks very much.

348
00:21:10,593 --> 00:21:11,373
Thank you too.

349
00:21:11,987 --> 00:21:14,727
That's been ISAMS Explained, Level 1.